You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
GPS-BASED AUTONOMOUS SPACE NAVIGATION
SBC: Arrowsmith Technologies Inc Topic: N/ACOMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...
SBIR Phase I 1992 Department of Transportation -
COMPUTER-BASED PAVEMENT DISTRESS INDENTIFICATION SYSTEM
SBC: Brent Rauhut Engineering Inc. Topic: N/AN/A
SBIR Phase I 1993 Department of Transportation -
MULTIVORTEX COLLECTOR OF EXPLOSIVE AGENTS
SBC: Energy Innovations, Inc. Topic: N/ATHE OBJECTIVE IS A COMPACT, RELIABLE AND INEXPENSIVE METHOD FOR SAMPLING LARGE VOLUMES OF AIR RAPIDLY TO DETERMINE THE CONCENTRATION OF AIRBORNE EXPLOSIVES. THE APPROACH INVOLVES THE USE OF A MULTIVORTEX PRECIPITATOR CAPABLE OF EFFICIENTLY REMOVING FINE PARTICULATES AND LARGE MOLERCULES FROM THE AIR AND COLLECTING THEM FOR CONVENIENT ANALYSIS. DURING PHASE I, A PROTOTYPE WILL BE TESTED FOR COLLECT ...
SBIR Phase I 1993 Department of Transportation -
NEURAL NETWORK LANE CHANGE DETECTOR
SBC: Exodyne Technologies, Inc. Topic: N/AN/A
SBIR Phase II 1993 Department of Transportation -
STRUCTURES
SBC: Invocon Consultants Topic: N/AA NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...
SBIR Phase II 1992 Department of Transportation -
DESIGN STUDY FOR A REDUCED ENERGY AND SIZE, PULSED DEUTERON ACCELERATOR FOR USE IN A PFNA EXPLOSIVES DETECTION SYSTEM.
SBC: National Electrostatics Corp. Topic: N/AA PROTOTYPE FOR AN EXPLOSIVE DETECTION SYSTEM USING PULSED FAST NEUTRON ACTIVATION (PFNA) TECHNIQUES USES AN ELECTROSTATIC TANDEM ACCELERATOR TO PRODUCE NANOSECOND WIDTH PULSES OF 6 MEV DEUTERONS. WHILE THIS APPROACH ALLOWS ONE TO PRODUCE NEUTRONS OF AN ENERGY SUITED TO THE REACTION ONE HOPES TO EXCITE IN SAMPLE ATOMS OF INTEREST, IT REQUIRES THE USE OF A FAIRLY LARGE AND EXPENSIVE ACCELERATOR SYS ...
SBIR Phase I 1993 Department of Transportation -
INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS
SBC: Omega Point Laboratorytorie Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
CABIN SMOKE CONTROL- PHASE I
SBC: Omega Technical Services Topic: N/AWHILE INFREQUENT, THE OCCURENCE OF AN IN-FLIGHT FIRE ABOARD COMMERCIAL AIRCRAFT PRESENTS A DANGEROUS SITUATION WHICH HAS HAD CATASTROPHIC RESULTS IN THOSE FEW CASES IN WHICH THE EMERGENCY HAS DEVELOPED BEYOND THE ABILITY OF THE EQUIPMENT AND CREW TO COPE WITH IT. WHEN FIRE OCCURS IN THE APSSENGER CABIN, THE RESULTING ACCUMULATION OF SMOKE AND HOT GASES PRESENT HAZARDOUS CONDITIONS TO THE OCCUPANTS ...
SBIR Phase I 1993 Department of Transportation -
DETECTION AND QUANTIFICATION OF SUBSURFACE CORROSION USING IMPROVED MAGNETO-OPTIC/EDDY-CURRENT IMAGING AND IMAGE PROCESSING
SBC: PHYSICAL RESEARCH, INC. Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION
SBC: Stress Eng Services, Inc Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation