You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. HOLD

    SBC: Airdex Corpon            Topic: N/A

    THE TIME REQUIRED FOR CLEANING, DEHUMIDIFYING AND PURGING OFCARGO HOLDS HAS A DIRECT EFFECT ON THE TURN AROUND TIME OF VESSELS CARRYING MOISTURE SENSITIVE GOODS IN PORT. THIS PROPROJECT WILL THOROUGHLY RESEARCH THE REQUIREMENTS FOR DEHUMIDIFICATION, DEVELOP DESIGN CRITERIA, DESIGN CRITERIA , DESIGN A REFRIGERANT TYPE DEHUMIDIFIER, CONSTRUCT A PROTO TYPE, AND TEST THE EQUIPMENT IN THE FIELD. PARTIC ...

    SBIR Phase I 1985 Department of Transportation
  2. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  3. COLLISION AVOIDANCE TECHNIQUE USED BY THE MAJOR RAILROADS OF THE US STILL RELY ON THE ALERTNESS OF THE LOCOMOTIVE ENGINEER TO SEE AND RESPOND TO WARNING SIGNALS DISPLAYED IN THE ENGINE COMPARTMENT AND ALONG THE RIGHT-OF-WAY.

    SBC: Expert Systems Engineers            Topic: N/A

    COLLISION AVOIDANCE TECHNIQUE USED BY THE MAJOR RAILROADS OF THE US STILL RELY ON THE ALERTNESS OF THE LOCOMOTIVE ENGINEER TO SEE AND RESPOND TO WARNING SIGNALS DISPLAYED IN THE ENGINE COMPARTMENT AND ALONG THE RIGHT-OF-WAY. SO LONG AS THE ENGINEER REMAINS ALERT, THE SYSTEM WORKS WELL, BUT WHEN THE ENGINEER IS NOT QUICK TO PERCEIVE AND REACT TO DANDER SIGNALS, THE SYSTEM FAILS. MAINTAINING ENGINEE ...

    SBIR Phase I 1985 Department of Transportation
  4. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
  5. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  6. STRESSMETER FOR MEASURING DYNAMIC BRIDGE STRESSES

    SBC: Re/Spec Inc.            Topic: N/A

    A NEED EXISTS FOR A COMPACT, PORTABLE SYSTEM CAPABLE OF MEASURING DYNAMIC STRESSES INDUCED BY HEAVY TRUCKS IN THE STRU- TURAL MEMBERS OF BRIDGES. USE OF STATE-OF-OF THE-ART ELEC- TRONIC CIRCUITRY NOW ALLOWS CONSTRUCTION OF A HYBRID ANALOG-DIGITAL INDICATOR THATCAN DISPLAY THE PEAK STRESSES A BRIDGEEXPERIENCES BY USING DATA FROM STRAIN SENSORS ATTACHED TO THE BRIDGE. THE FEASIBILITY OF BUILDING SUC ...

    SBIR Phase I 1988 Department of Transportation
  7. NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  8. A RELIABLE LOCOMITIVE CAB ALERTER

    SBC: TECHNOLOGY INTERNATIONAL INCORPORATED OF VIRGINIA            Topic: N/A

    SEVERAL CONCEPTS ARE PROPOSED FOR LOCOMOTIVE CAB ALERTERS THAT CAN BE RETROFITTED TO ALERTER SYSTEMS ALREADY IN SERVICE. THE CONCEPTS INCLUDE A TOUCH SCREEN, WHICH REQUIRES TOUCHING A TARGET TO RESET THE TIMER OR TO RESPOND TO THE ALERTER LIGHT PROMPT. THE INITIAL LOCATION OF THE TARGET ON THE SCREEN IS AUTOMATICALLY SELECTED AT RANDOM. ANOTHER CONCEPT IS THE USE OF A TELEPHONE KEYPAD WITH LCD, WH ...

    SBIR Phase I 1992 Department of Transportation
  9. SMALL SIZED, CONTINUOUS MONITORING PIEZOELECTRIC CRYSTAL OR SAW DETECTORS WILL BE DEVELOPED FOR DETECTION OF COF OF CONTRABAND DRUGS USING IMMOBILIZED ANTIBODIES.

    SBC: Universal Sensors, Inc.            Topic: N/A

    SMALL SIZED, CONTINUOUS MONITORING PIEZOELECTRIC CRYSTAL OR SAW DETECTORS WILL BE DEVELOPED FOR DETECTION OF COF OF CONTRABAND DRUGS USING IMMOBILIZED ANTIBODIES. MONITORS WILL BE DESIGNED THAT ARE (1) SPECIFIC FOR ONE DRUG AND (2) GENERAL DETECTORS FOR ANY OF SEVERAL DRUGS THAT MIGHT BE PRESENT. MONITORS WILL BE DESIGNED THAT ARE SIMPLE TO USE, OF LOW COST, AND ARE BASED ON ANALYTICAL METHODOLOGY ...

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government