You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
DYNAMIC GPS ATTITUDE DETERMINING SYSTEM FOR MARINE APPLICATIONS
SBC: Adroit Systems, Inc. Topic: N/AA 3-DIMENSIONAL ATTITUDE SENSOR WHICH USES GPS CARRIER PHASEINTERFEROMETRY IS PROPOSED FOR ANALYSIS AND CONCEPT TESTING IN PHASE I, AND PROTOTYPING IN PHASE II. THE RESULTING SENSOR WILL BE ACCURATE AT ANY LATITUDE. ADROIT SYSTEMS PROPOSES TO ENHANCE ITS SUCCESSFUL 2-DIMENSIONAL, STATIC GPSATTITUDE DETERMINING SYSTEM (ADS) SO THAT IT WILL OPERATE UNDER DYNAMIC CONDITIONS WHILE MEASURING 3-DIMENSIO ...
SBIR Phase II 1992 Department of Transportation -
AN INNOVATIVE OBSTACLE DETECTION SYSTEM FOR HIGH SPEED GUIDED GROUND TRANSPORTATION
SBC: Adroit Systems, Inc. Topic: N/AAN INNOVATIVE OBSTACLE DETECTION SYSTEM BASED ON A RAIL-GUIDED PROPELLER-DRIVEN POD CONTAINING A MICROWAVE RADAR SENSOR IS PROPOSED. THE SENSOR POD WILL TRAVEL A FEW MILES AHEAD OF THE HIGH SPEED TRAIN OR MAGLEV VEHICLE, DETECT POTENTIAL OBSTACLES, AND ENACT AN APPROPRIATE WARNING OR AVOIDANCE PROCEDURE. THE PROPOSED OBSTACLE DETECTION SYSTEM HAS MANY HIGHLY DESIRABLE FEATURES INCLUDING: A VERY LO ...
SBIR Phase I 1992 Department of Transportation -
SHIP MANEUVERING SIMULATION FOR PASSAGE PLANNING AND TRAINING
SBC: Advanced Marine Enterprises, Topic: N/ATHE ULTIMATE OBJECTIVE OF THIS RESEARCH EFFORT IS THE DEVELOPMENT OF A SHIP MANEUVERING SIMULATION SOFTWARE PACKAGE FOR SHIPBOARD USE IN MANEUVERING ASSESSMENT, PASSAGE PLANNING AND TRAINING. THE SOFTWARE MUST OPERATE IN A STAND ALONE MODE AND/OR INTEGRATED WITH THE SHIP'S NAVIGATION AND CONTROL SYSTEM. THE PHASE 1 EFFORT INCLUDES THE INITIAL DETERMINATION OF THE REQUIREMENTS FOR THIS SOFTWARE PAC ...
SBIR Phase I 1992 Department of Transportation -
GPS-BASED AUTONOMOUS SPACE NAVIGATION
SBC: Arrowsmith Technologies Inc Topic: N/ACOMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...
SBIR Phase I 1992 Department of Transportation -
INSTRUMENTATION (ADVANCED INSTRUMENTATION FOR STANDARDIZED EMP TESTING)
SBC: ENSCO Inc Topic: N/AA GREAT DEAL OF EFFORT HAS BEEN SPENT IN RECENT YEARS TO DEVELOP STANDARDIZED METHODOLOGIES FOR ACCEPTING AND VERIFYING EMP HARDENED MILITARY FACILITIES. THE FIRST OF THESE STANDARDIZATION EFFORTS TO BE PUT INTO EFFECT APPLIES TO FIXED SITE, CRITICAL, TIME URGENT C4I FACILITIES. THE REQUIREMENTS EXISTS FOR AN ADVANCED INSTRUMENTATION APPROACH THAT CAN OVERCOME THE DIFFICULT ACQUISITION ENVIRONMENT ...
SBIR Phase I 1992 Department of DefenseDefense Threat Reduction Agency -
NUCLEAR WEAPONS EFFECTS SIMULATION (INDUCTIVE COUPLER DEVELOPMENT FOR DIRECT DRIVE SIMULATION)
SBC: ENSCO Inc Topic: N/AONE COMMON NUCLEAR WEAPONS EFFECTS CIMULATION TECHNIQUE SIMULATES THE EMP RESPONSE OF LONG CABLES USING DIRECT CURRENT INJECTION. DIRECT CURRENT INJECTION TYPICALLY INVOLVES THE CONNECTION OF HIGH VOLTAGE PULSE SOURCES TO THE CABLES THAT ARE ATTACHED TO A MILITARY SYSTEM. A RECENTLY DEVELOPED MILITARY STANDARD SPECIFIES THAT DIRECT CURRENT INJECTION TESTING WILL BE USED IN CONJUNCTION WITH SEVERAL ...
SBIR Phase I 1992 Department of DefenseDefense Threat Reduction Agency -
EMBEDDED PAVEMENT STRESS SENSORS CONTAINING PIEZOELECTRIC COMPOSITES
SBC: Fiber Materials, Inc. Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
STUDY OF ION MASS EFFECTS ON LONG CONDUCTION TIME PLASMA OPENING SWITCHES USING RESONANT DIAGNOSTIC TECHNIQUES
SBC: HY-Tech Research Corp. Topic: N/APLASMA EROSION OPENING SWITCHES (PEOS) ARE FINDING MANY APPLICATIONS IN PULSE POWER MULTIPLICATION AND THE SWITCHING OF INDUCTIVE STORAGE DEVICES FOR PULSED POWER APPLICATIONS. SUCH A SWITCH OPERATES BY USING AN EXTERNAL PLASMA SOURCE TO SHORT A GAP WHICH CONDUCTS CURRENT FROM A LOW VOLTAGE CAPACITIVE SOURCE FOR 100 NANOSECOND TIME SCALES. AT A CRITICAL CURRENT DENSITY THE PLASMA ERODES AND THE SW ...
SBIR Phase II 1992 Department of DefenseDefense Threat Reduction Agency -
DEVELOPMENT OF UNIFORM GAS DISCHARGE PLASMA SOURCES FOR PLASMA OPENING SWITCH APPLICATIONS
SBC: HY-Tech Research Corp. Topic: N/AN/A
SBIR Phase I 1992 Department of DefenseDefense Threat Reduction Agency -
STRUCTURES
SBC: Invocon Consultants Topic: N/AA NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...
SBIR Phase II 1992 Department of Transportation