You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Welding High Performance Bridge Steel with a Pulsed Energy Source
SBC: KAI, LLC Topic: 132FH1This proposal is in response to announcement DTRT57-13-R-SBIR2 in the area 13.2-FH1, Development of Innovative Welding for High Performance Bridge Steel. It is proposed to use Homopolar Generator (HPG) Welding to join the high performance bridge steel in the 3” by 30” cross sections mentioned in the announcement in under 1 second. All of the energy required to perform the weld is stored in the ...
SBIR Phase I 2014 Department of Transportation -
Development of Middle School and High School STEM Programs in ITS and CV Technologies
SBC: NANOSONIC INC. Topic: 141FH4NanoSonic will work with the Giles County, Virginia,school system,and Leidos, a developer of ITS NanoSonic will work with the Giles County, Virginia,school system,and Leidos,a developer of ITS and CV technologies,to create and deliver a set of STEM lesson plans involving ITS and CV concepts. With Leidos transportation engineers, NanoSonic will identify project ideas,and with Giles County STEM teac ...
SBIR Phase I 2014 Department of Transportation -
In-situ Sensors for Cathodic Protection Interrelationships Modeling
SBC: SENCONTROLOGY, INC. Topic: 132PH2To adequately protect underground pipelines, a coating (including polyurethane foams) must conduct CP current when disbondment occurs. The realization of a reliable, multi-functional process/material system that can ensure urethane foams not only perform in harmony with CP, but establishing the worthiness of their continued use would be of major benefit to the national transportation system. Senc ...
SBIR Phase I 2014 Department of Transportation -
Entire Ship Ballast Autonomous Wireless Monitoring System
SBC: INVOCON, INC. Topic: N/AThe exchange of ship ballast water has introduced non-native organisms to ports around the world. These bioinvaders are non-indigenous species that have the potential to upset local ecological systems and economics. Various treatment methods are in limited use or experimentation: heat treatment, ultraviolet, chemical, and filtration. These are successful in eliminating a portion of the organis ...
SBIR Phase I 2002 Department of Transportation -
Nonlinear Ultrasonic Rail Inspection System
SBC: NASCENT TECHNOLOGY SOLUTIONS, LLC Topic: N/ARail inspection has seen steady, incremental advances for decades. From early Sperry ultrasonic inspection cars to EMATS, rail NDE has followed a tried and true path ¿ launch carefully selected critical angle waves to inspect a region of the rail under or near the sensors. In this proposal, we take a fundamental departure from that tradition to better differentiate critical defects. Our approac ...
SBIR Phase I 2002 Department of Transportation -
DYNAMIC GPS ATTITUDE DETERMINING SYSTEM FOR MARINE APPLICATIONS
SBC: Adroit Systems, Inc. Topic: N/AA 3-DIMENSIONAL ATTITUDE SENSOR WHICH USES GPS CARRIER PHASEINTERFEROMETRY IS PROPOSED FOR ANALYSIS AND CONCEPT TESTING IN PHASE I, AND PROTOTYPING IN PHASE II. THE RESULTING SENSOR WILL BE ACCURATE AT ANY LATITUDE. ADROIT SYSTEMS PROPOSES TO ENHANCE ITS SUCCESSFUL 2-DIMENSIONAL, STATIC GPSATTITUDE DETERMINING SYSTEM (ADS) SO THAT IT WILL OPERATE UNDER DYNAMIC CONDITIONS WHILE MEASURING 3-DIMENSIO ...
SBIR Phase II 1992 Department of Transportation -
AN INNOVATIVE OBSTACLE DETECTION SYSTEM FOR HIGH SPEED GUIDED GROUND TRANSPORTATION
SBC: Adroit Systems, Inc. Topic: N/AAN INNOVATIVE OBSTACLE DETECTION SYSTEM BASED ON A RAIL-GUIDED PROPELLER-DRIVEN POD CONTAINING A MICROWAVE RADAR SENSOR IS PROPOSED. THE SENSOR POD WILL TRAVEL A FEW MILES AHEAD OF THE HIGH SPEED TRAIN OR MAGLEV VEHICLE, DETECT POTENTIAL OBSTACLES, AND ENACT AN APPROPRIATE WARNING OR AVOIDANCE PROCEDURE. THE PROPOSED OBSTACLE DETECTION SYSTEM HAS MANY HIGHLY DESIRABLE FEATURES INCLUDING: A VERY LO ...
SBIR Phase I 1992 Department of Transportation -
SHIP MANEUVERING SIMULATION FOR PASSAGE PLANNING AND TRAINING
SBC: Advanced Marine Enterprises, Topic: N/ATHE ULTIMATE OBJECTIVE OF THIS RESEARCH EFFORT IS THE DEVELOPMENT OF A SHIP MANEUVERING SIMULATION SOFTWARE PACKAGE FOR SHIPBOARD USE IN MANEUVERING ASSESSMENT, PASSAGE PLANNING AND TRAINING. THE SOFTWARE MUST OPERATE IN A STAND ALONE MODE AND/OR INTEGRATED WITH THE SHIP'S NAVIGATION AND CONTROL SYSTEM. THE PHASE 1 EFFORT INCLUDES THE INITIAL DETERMINATION OF THE REQUIREMENTS FOR THIS SOFTWARE PAC ...
SBIR Phase I 1992 Department of Transportation -
GPS-BASED AUTONOMOUS SPACE NAVIGATION
SBC: Arrowsmith Technologies Inc Topic: N/ACOMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...
SBIR Phase I 1992 Department of Transportation -
EMBEDDED PAVEMENT STRESS SENSORS CONTAINING PIEZOELECTRIC COMPOSITES
SBC: Fiber Materials, Inc. Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation