You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A Quantitative Non-destructive Residual Stress Assessment Tool for Pipelines

    SBC: Generation 2 Materials Technology Llc            Topic: 111PH2

    There exists a wide-range need in both industry and government for quantitative residual stress measurements. Generation 2 Materials Technology LLC (G2MT) will collaborate with partners from industry and government to calibrate and commercialize the eStress system to assess residual stress from mechanical damage and re-rounding. The industrial members, consortiums, and government laboratories who ...

    SBIR Phase II 2012 Department of Transportation
  2. A PC-BASED SIMULATOR WITH EXPERT SYSTEM FOR AIRSPACE DESIGN

    SBC: Wesson International Inc.            Topic: N/A

    INNOVATIVE METHODS OF MAN/MACHINE COMMUNICATION WILL BE PROPOSED, IMPLEMENTED, AND STUDIED EXPERIMENTALLY WITHIN THECONTEXT OF AN EXISTING HIGH-FIDELITY PC-BASED ATC SIMULATOR (TRACON(TM)). THE SPECIFIC POSSIBILITIES INCLUDE, BUT ARE NOT LIMITED TO, MOUSE/TRACKBALL-BASED POPUP AND PULLDOWN MENUS AND DIALOG BOXES, VOICE I/O FOR DATABASE LOOKUP, DIGITAL COMMUNICATIONS INCLUDING A TACTICAL COMMUNICAT ...

    SBIR Phase II 1990 Department of Transportation
  3. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
  4. MULTICHAIN LORAN-C TIME DIFFERENCE MONITOR RECEIVER

    SBC: LOCUS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  5. NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  6. INVESTIGATION OF STRUCTURAL ADHESIVES

    SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  7. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  8. EMBEDDED PAVEMENT STRESS SENSORS CONTAINING PIEZOELECTRIC COMPOSITES

    SBC: Fiber Materials, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  9. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
US Flag An Official Website of the United States Government