You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Low Friction hybridSil Coatings for Preventing Vehicle Rollover on Concrete Barriers
SBC: NANOSONIC INC. Topic: 121FH1The objective of this DoT SBIR program is to establish a technical foundation enabling the rapid commercial integration of low friction HybridSil™ coatings on concrete barriers for drastic reductions in vehicle rollover potential. Phase I coatings would have immediate utility within a broad spectrum of concrete barriers designs with readily spray or paint depositions capabilities in traffic env ...
SBIR Phase I 2012 Department of Transportation -
A Quantitative Non-destructive Residual Stress Assessment Tool for Pipelines
SBC: Generation 2 Materials Technology Llc Topic: 111PH2There exists a wide-range need in both industry and government for quantitative residual stress measurements. Generation 2 Materials Technology LLC (G2MT) will collaborate with partners from industry and government to calibrate and commercialize the eStress system to assess residual stress from mechanical damage and re-rounding. The industrial members, consortiums, and government laboratories who ...
SBIR Phase II 2012 Department of Transportation -
A MEMs-Based Real-Time On-Board Skid Warning System
SBC: LUNA INNOVATIONS INCORPORATED Topic: N/ANot Available There is current need for a lower-cost method of acquiring ultra high range resolution (UHRR) radar signatures for a variety of aircraft. The proposed research will produce a conceptual telescience system design suitable for the remotely-supervised semi-autonomous operation of a portable data collection radar. This radar data collection concept will reduce the costs of acquiring mea ...
SBIR Phase I 1999 Department of Transportation -
N/A
SBC: Shenandoah Mountain Topic: N/AN/A
SBIR Phase II 1999 Department of Transportation -
N/A
SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC. Topic: N/AN/A
SBIR Phase II 1999 Department of Transportation -
N/A
SBC: UTD, INC. Topic: N/AN/A
SBIR Phase II 1999 Department of Transportation -
N/A
SBC: UTD, INC. Topic: N/AN/A
SBIR Phase II 1999 Department of Transportation -
N/A
SBC: Wph Associates Topic: N/AN/A
SBIR Phase II 1999 Department of Transportation -
DYNAMIC GPS ATTITUDE DETERMINING SYSTEM FOR MARINE APPLICATIONS
SBC: Adroit Systems, Inc. Topic: N/AA 3-DIMENSIONAL ATTITUDE SENSOR WHICH USES GPS CARRIER PHASEINTERFEROMETRY IS PROPOSED FOR ANALYSIS AND CONCEPT TESTING IN PHASE I, AND PROTOTYPING IN PHASE II. THE RESULTING SENSOR WILL BE ACCURATE AT ANY LATITUDE. ADROIT SYSTEMS PROPOSES TO ENHANCE ITS SUCCESSFUL 2-DIMENSIONAL, STATIC GPSATTITUDE DETERMINING SYSTEM (ADS) SO THAT IT WILL OPERATE UNDER DYNAMIC CONDITIONS WHILE MEASURING 3-DIMENSIO ...
SBIR Phase II 1992 Department of Transportation -
AN INNOVATIVE OBSTACLE DETECTION SYSTEM FOR HIGH SPEED GUIDED GROUND TRANSPORTATION
SBC: Adroit Systems, Inc. Topic: N/AAN INNOVATIVE OBSTACLE DETECTION SYSTEM BASED ON A RAIL-GUIDED PROPELLER-DRIVEN POD CONTAINING A MICROWAVE RADAR SENSOR IS PROPOSED. THE SENSOR POD WILL TRAVEL A FEW MILES AHEAD OF THE HIGH SPEED TRAIN OR MAGLEV VEHICLE, DETECT POTENTIAL OBSTACLES, AND ENACT AN APPROPRIATE WARNING OR AVOIDANCE PROCEDURE. THE PROPOSED OBSTACLE DETECTION SYSTEM HAS MANY HIGHLY DESIRABLE FEATURES INCLUDING: A VERY LO ...
SBIR Phase I 1992 Department of Transportation