You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
IMPROVEMENT IN THE GRAPHITE REFERENCE CELL FOR REINFORCED CONCRETE
SBC: GINER INC Topic: N/AFOR CATHODIC PROTECTION SYSTEMS TO BE SUCCESSFUL IN MITIGATING CORROSION WITHOUT CAUSING HYDROGEN EMBRITTLEMENT OF PRESTRESSING STEEL, THE AMOUNT OF POLARIZATION OF THE EMBEDDED STEEL MUST BE VERY ACCURATELY CONTROLLED. PRESENTLY AVAILABLE EMBEDDED REFERENCE ELECTRODES DO NOT HAVE THE LONG TERM STABILITY OR RELIABILITY RE@UIRED TO MONITOR AND CONTROL THE AMOUNT OF POLARIZATION WITH THE ACCURACY RE ...
SBIR Phase II 1993 Department of Transportation -
SEISMIC DISCRIMINANTS IN EURASIA
SBC: ENSCO Inc Topic: N/ATHIS PROPOSED PHASE I RESEARCH PROJECT PROVIDES A UNIQUE OPPORTUNITY TO REVIEW REGIONAL SEISMIC DISCRIMINANTS, DEVELOPA STATISTICAL METHOD FOR IDENTIFYING EVENTS, DEVELOP QUALITY CONTROL PROCEDURES FOR ALLOWING FOR EFFECTS OF NOISE AND REGIONAL PROPAGATION EFFECTS ON DISCRIMINANTS, AND TO STATISTICALLY ANALYZE THE DISCRIMINATION CAPABILITY OF THESE REGIONAL DISCRIMINANTS. THE LARGE DATABASE OFREGI ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
NEURAL NETWORK LANE CHANGE DETECTOR
SBC: Exodyne Technologies, Inc. Topic: N/AN/A
SBIR Phase II 1993 Department of Transportation -
OPTICAL FIBER SENSOR-BASED SMART MATERIALS AND STRUCTURES
SBC: LUNA INNOVATIONS INCORPORATED Topic: N/ASMART MATERIALS OFFER EXCITING OPPORTUNITIES FOR THE IMPLEMENTATION OF ADAPTIVE STRUCTURES. SMART MATERIALS ARE A NEW CLASS OF MATERIALS, WHICH CONTAIN THEIR OWN INTERNAL SENSOR, ACTUATOR AND SIGNAL PROCESSING, ELEMENTS. THESE STRUCTURALLY AND FUNCTIONALLY INTEGRATED ELEMENTS GIVE THE MATERIAL THE CAPABILITY TO DETECT CHANGES IN ITS ENVIROMENT, CHANGE ITS STRUCTURAL, ELECTROMAGNETIC AND/OR CHEMICA ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
CERAMIC SHIELDS FOR SATELLITE PROTECTION AGAINST HYPERVELOCITY IMPACT
SBC: Interferometrics, Inc. Topic: N/AIMPROVED SPACECRAFT SHIELDING CAN BE REALIZED THROUGH CERAMIC AND ADVANCED ARMOR TECHNOLOGY TRANSFER FROM MILITARY RESEARCH AND DEVELOPMENT PROGRAMS. A SIGNIFICANT IMPROVEMENT IN THE MASS EFFICIENCY, THE EFFECTIVENESS AND THE COST BENEFIT OF SPACECRAFT SHIELDING WILL RESULT. OUR MATERIAL SELECTION, DESIGN AND OPTIMIZATION PROGRAM WILL FURTHER THE STATE OF THE ART IN ADVANCED SPACECRAFT ARMORS. INT ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
DOMAIN SPECIFIC SOFTWARE PROCESS AUTOMATION TECHNOLOGY
SBC: International Software Topic: N/ATHIS PROPOSAL OUTLINES A FIRST-PHASE PLAN FOR CONSTRUCTING AN ENVIRONMENT TO DESCRIBE, PROTOTYPE, AND MANAGE SOFTWARE DEVELOPMENT PROCESSES. KEY TOOLS OF THIS ENVIRONMENT INCLUDE SEMANTICALLY RICH GRAPHICAL EDITORS TO DESCRIBE PROCESSES AND AN INTERPRETER FOR PROCESS SIMULATION AND INTERACTIVE EVALUATION OF SCHEDULING AND RESOURCE ALLOCATION AGAINST THE MODEL. THE ENVIRONMENT WILL BE BUILT ON PROT ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
A KNOWLEDGE-BASED AUTOMATED PROCESS PLANNING SYSTEM (KAPPS) WITH ASSUMPTION-BASED TRUTH MAINTENANCE SYSTEM AND GEOMETRIC
SBC: KNOWLEDGE BASED SYSTEMS INC Topic: N/ATHE GOAL OF AMERICAN INDUSTRY LOOKING TO THE FIERCE COMPETITION OF THE NEXT DECADE IS TO MANUFACTURE PRODUCTS (1) AT REDUCED COSTS, (2) WITH SHORTER LEAD TIMES, AND (3) AT A HIGHER QUALITY. COMPONENTS THAT WOULD ASSIST IN ACHIEVING THIS GOAL INCLUDE (1) AUTOMATED PROCESS PLANNING, (2) DESIGN RETRIEVAL, AND (3) PRODUCIBILITY/VALUE ANALYSIS. NEEDED TECHNOLOGICAL BREAKTHROUGHS FOR EFFECTIVE COMPUTER- ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
EVALUATION METHODS AND METRICS FOR IMAGE PROCESSING AND UNDERSTANDING SYSTEMS
SBC: LYNNE GILFILLAN ASSOC., INC. Topic: N/ATHE PROJECT PROPOSED WILL DEVELOP A SUITE OF METRICS FOR THE EVALUATION OF OVERALL PERFORMANCE OF IU SYSTEMS, AS WELL AS FOR THE ASSESSMENT AND DIAGNOSIS OF INDIVIDUAL SYSTEM COMPONENTS. THE METRICS WILL ADDRESS THE ISSUES OF THE GENERALITY AND STANDARDIZATION OF METRICS TO PERMIT CROSS-SYSTEM COMPARISONS. THE DIMENSIONS TO BE INVESTIGATED FOR METRICS DEVELOPMENT WILL INCLUDE: ACCURACY, COMPATIBIL ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
DARE: A DOMAIN ANALYSIS AND REUSE ENVIRONMENT
SBC: Reuse, Inc. Topic: N/ADOMAIN ANALYSIS (DA) HOLDS THE KEY FOR A SYSTEMATIC, FORMAL, AND EFFECTIVE PRACTICE OF SOFTWARE REUSE. PROPOSED APPROACHES AND METHODS FOR DA ASSUME THAT DOMAIN KNOWLEDGE EXISTS AND IS READILY USABLE. EXPERIENCE INDICATES, HOWEVER, THAT ACQUIRING AND STRUCTURING KNOWLEDGE IS THE BOTTLENECK OF DA. A RECENT METHODOLOGY DEVELOPED BY REUSE, INC. FOR THE STARS PROGRAM (REUSE LIBRARY PROCESS MODEL, RLPM ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency -
FEASIBILITY DEMONSTRATION OF A NOVEL CONCEPT TO PROVIDE POSITIVE COMBAT IDENTIFICATION AMONG DIVERSE FRIENDLY FORCES...
SBC: Sesco Topic: N/ATHE RESEARCH EFFORTS ASSOCIATED WITH THIS PHASE I SBIR PROPOSAL, AND ITS POSSIBLE PHASEII FOLLOW-ON, ARE EXPECTED TO EBTABLISH CONCEPTUAL FEASIBILITY AND DEMONSTRATED PRACTICALITY OF A NOVEL CONCEPT FOR PROVIDING POSITIVE COMBAT IDENTIFICATION AMONG DIVERSE FRIENDLY FORCES. THE ASSOCIATED POSTIVE COMBAT IDENTIFICATION DEVICE (PCID) CONCEPT INCORPORATES SESCO PROPRIETARY (PATENT PENDING) SW&RM HARD ...
SBIR Phase II 1993 Department of DefenseDefense Advanced Research Projects Agency