You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. DYNAMIC GPS ATTITUDE DETERMINING SYSTEM FOR MARINE APPLICATIONS

    SBC: Adroit Systems, Inc.            Topic: N/A

    A 3-DIMENSIONAL ATTITUDE SENSOR WHICH USES GPS CARRIER PHASEINTERFEROMETRY IS PROPOSED FOR ANALYSIS AND CONCEPT TESTING IN PHASE I, AND PROTOTYPING IN PHASE II. THE RESULTING SENSOR WILL BE ACCURATE AT ANY LATITUDE. ADROIT SYSTEMS PROPOSES TO ENHANCE ITS SUCCESSFUL 2-DIMENSIONAL, STATIC GPSATTITUDE DETERMINING SYSTEM (ADS) SO THAT IT WILL OPERATE UNDER DYNAMIC CONDITIONS WHILE MEASURING 3-DIMENSIO ...

    SBIR Phase II 1992 Department of Transportation
  2. VIDEO COMPRESSION FOR TRANSMISSION OF ATC DISPLAYS TO REMOTETOWER CAB

    SBC: DELTA INFORMATION SYSTEMS INC            Topic: N/A

    THIS DOCUMENT IS AN SBIR TECHNICAL PROPOSAL SUBMITTED TO THEFEDERAL AVIATION ADMINISTRATION BY DELTA INFORMATION SYSTEMS, INC. IN RESPONSE TO SBIR SOLICITATION NUMBER 91-FA11. THE PURPOSE OF THE PROPOSED PROGRAM IS TO INVESTIGATE, ANALYZE, AND DESIGN ALTERNATIVE DATA COMPRESSION SYSTEMS TO EFFICIENTLY TRANSMIT AIR TRAFFIC CONTROL DISPLAY DATA FROM MAJOR AIRPORTS TO SMALLER SATELLITE AIRPORTS ON LI ...

    SBIR Phase II 1992 Department of Transportation
  3. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
US Flag An Official Website of the United States Government