You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
  2. MULTICHAIN LORAN-C TIME DIFFERENCE MONITOR RECEIVER

    SBC: LOCUS, INC.            Topic: N/A

    USCG SOLICITATION 90-CG5 SUGGESTS EVALUATION OF KALMAN FILTERING A DIGITAL SIGNAL PROCESSING (DSP) TECHNIQUE, TO IMPROVE GEODETIC POSITIONING PROVIDED BY SINGLE CHAIN, AND EVENTUALLY, MULTICHAIN LORAN RECEIVERS. A DSP TECHNIQUE COMPARABLE TO KALMAN FILTERING HAS ALREADY BEEN IMPLEMENTED ON A SINGLE CHAIN LORAN RECEIVER, RESULTING IN SUBSTANTIAL GEODETIC POSITIONING IMPROVEMENTS IN NOISY, DYNAMIC E ...

    SBIR Phase II 1991 Department of Transportation
  3. OPERATOR ALERTNESS MONITORING USING THE PUPIL LIGHT REFLEX

    SBC: Pulse Electronics Inc            Topic: N/A

    A KEY FACTOR IN THE ABILITY TO SAFELY OPERATE A TRAIN IS THEOPERATOR ALERTNESS. OPERATOR ALERTNESS CAN BE COMPROMISED AS A RESULT OF FATIGUE, SUBSTANCE ABUSE OR EMOTIONAL DISTRESS. A DEVICE THAT WOULD OBJECTIVELY REPORT A PERSONS STATE OF ALERTNESS COULD INDICATE THAT PERSONS FITNESS FOR DUTY, FOR EXAMPLE, AT THE BEGINNING OF A SHIFT. IT IS WELL KNOWN THAT ALERTNESS IS HIGHLY CORRELATED WITH VARIO ...

    SBIR Phase II 1991 Department of Transportation
  4. INVESTIGATION OF STRUCTURAL ADHESIVES

    SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC.            Topic: N/A

    THIS PROJECT IS DESIGNED TO FURNISH FHWA WITH A NUMBER OF IMPORTANT PRODUCTS IN PREPARATION FOR ACCELERATED LIFE TESTING (ALT) OF A LARGE SCALE MODEL JOINT AND A LONG TERM FULL SCALE BEAM TEST TO VERIFY THE ALT. THE MOST IMPORTANT PRODUCT IS A PROCEDURE FOR INTRODUCING DESIRED MOISTURE LEVELS INTO LARGE AREA BONDS IN A RELATIVELY SHORT TIME. A SECOND PRODUCT IS THE ALT PLAN WHICH ACCOUNTS FOR THE ...

    SBIR Phase II 1991 Department of Transportation
  5. INFRARED ICE ACCRETION MEASUREMENT SYSTEM

    SBC: Sinnar Associates            Topic: N/A

    REMOTE RUNWAY SURFACE CONDITION SENSORS THAT COULD DETECT ICE ONSET AND MONITOR ITS RATE OF ACCRETION ON AIRPORT OPERATIONAL SURFACES WOULD ENHANCE THE RUNWAY SAFETY WHILE REDUCING AIRPORT EQUIPMENT, MANPOWER AND CHEMICAL COSTS. THROUGH ANALYSIS WE DEMONSTRATE HOW AN INFRARED RADIATION TRANSMISSION THROUGH ICE/WATER CAN BE USED TO DISTINGUISH ICE ACCRETION FROM WATER ACCUMULATION, MEASURE ICE ACCR ...

    SBIR Phase II 1986 Department of Transportation
US Flag An Official Website of the United States Government