You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
AIRCRAFT SAFTEY
SBC: SYSTEMS & ELECTRONICS, INC. Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
A PC-BASED SIMULATOR WITH EXPERT SYSTEM FOR AIRSPACE DESIGN
SBC: Wesson International Inc. Topic: N/AN/A
SBIR Phase I 1989 Department of Transportation -
ATC MAN/MACHINE INTERFACE DESIGN USING A PC-BASED SIMULATOR
SBC: Wesson International Inc. Topic: N/AAN IBM PC-COMPATIBLE AIR TRAFFIC CONTROL SIMULATOR WITH VOICE I/O, AN EXTENSIVE DATABASE OF GEOGRAPHICAL FIXES, AND CONFLICT RESOLUTION VIA AN EXPERT SYSTEM IS PROPOSED. THIS SIMULATOR WILL BE DESIGNED TO FACILITATE AIRSPACE DESIGN ANDPROCEDURE DEVELOPMENT. CAPABLE OF DISPLAYING A REALTIME RADARSCOPE PICTURE OF ANY GEOGRAPHICAL AREA, ITS SECTORS MAYBE CREATED VIA A SIMPLE USER INTERFACE BY FIELD P ...
SBIR Phase I 1989 Department of Transportation -
COMPUTER-BASED PAVEMENT DISTRESS IDENTIFICATION SYSTEM
SBC: Eres Consultants Inc. Topic: N/AN/A
SBIR Phase I 1993 Department of Transportation -
COMPUTER-BASED PAVEMENT DISTRESS INDENTIFICATION SYSTEM
SBC: Brent Rauhut Engineering Inc. Topic: N/AN/A
SBIR Phase I 1993 Department of Transportation -
DESIGN STUDY FOR A REDUCED ENERGY AND SIZE, PULSED DEUTERON ACCELERATOR FOR USE IN A PFNA EXPLOSIVES DETECTION SYSTEM.
SBC: National Electrostatics Corp. Topic: N/AA PROTOTYPE FOR AN EXPLOSIVE DETECTION SYSTEM USING PULSED FAST NEUTRON ACTIVATION (PFNA) TECHNIQUES USES AN ELECTROSTATIC TANDEM ACCELERATOR TO PRODUCE NANOSECOND WIDTH PULSES OF 6 MEV DEUTERONS. WHILE THIS APPROACH ALLOWS ONE TO PRODUCE NEUTRONS OF AN ENERGY SUITED TO THE REACTION ONE HOPES TO EXCITE IN SAMPLE ATOMS OF INTEREST, IT REQUIRES THE USE OF A FAIRLY LARGE AND EXPENSIVE ACCELERATOR SYS ...
SBIR Phase I 1993 Department of Transportation -
GPS-BASED AUTONOMOUS SPACE NAVIGATION
SBC: Arrowsmith Technologies Inc Topic: N/ACOMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...
SBIR Phase I 1992 Department of Transportation -
INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS
SBC: Omega Point Laboratorytorie Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
INTEGRATION OF A SOIL IMPACT MODEL WITH KRASH
SBC: General Engineering and Systems Analysis Co Inc (GESAC) Topic: N/ADURING PHASE I, WE WILL DEVELOP AN ALGORITHM TO CALCULATE THE FORCES GENERATED DUE TO THE IMPACT OF AIRCRAFT STRUCTURES WITH SOIL. THIS ALGORITHM WILL BE INTEGRATED WITH THE CURRENT KRASH PROGRAM AS AN EXTERNAL FORCE ACTING ON THE VARIOUS MASS ELEMENTS THAT ARE DEFINED IN KRASH. THE FAILURE OF SOIL DUE TO THE IMPACT OF THE AIRCRAFT AND DRAGGING OF THE AIRCRAFT ALONG THE SURFACE WILL BE MODELLED TA ...
SBIR Phase I 1992 Department of Transportation -
MULTIVORTEX COLLECTOR OF EXPLOSIVE AGENTS
SBC: Energy Innovations, Inc. Topic: N/ATHE OBJECTIVE IS A COMPACT, RELIABLE AND INEXPENSIVE METHOD FOR SAMPLING LARGE VOLUMES OF AIR RAPIDLY TO DETERMINE THE CONCENTRATION OF AIRBORNE EXPLOSIVES. THE APPROACH INVOLVES THE USE OF A MULTIVORTEX PRECIPITATOR CAPABLE OF EFFICIENTLY REMOVING FINE PARTICULATES AND LARGE MOLERCULES FROM THE AIR AND COLLECTING THEM FOR CONVENIENT ANALYSIS. DURING PHASE I, A PROTOTYPE WILL BE TESTED FOR COLLECT ...
SBIR Phase I 1993 Department of Transportation