You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Advanced Truck for High Speed Freight Operations

    SBC: Sharma & Associates, Inc.            Topic: N/A

    During Phase I of the project, Sharma & Associates, Inc. developed a concept for a high speed freight truck intended for 70-ton, regular freight and bi-modal operation at speeds up to 150 mph. The truck uses a rigid frame and an independent, compliant, primary suspension for its basic architecture. Constant contact side-bearings and yaw dampers were also added to improve dynamic performance. Ve ...

    SBIR Phase II 2004 Department of Transportation
  2. AIRCRAFT SAFTEY

    SBC: SYSTEMS & ELECTRONICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  3. Equipment and Facilities for Rapid Installation of Buried Innerduct Network for Utility Lines

    SBC: Outside Plant Consulting Services, Inc.            Topic: N/A

    The feasibility of the universal placement of telecommunications and power supply lines below ground, as an alternative to their typically low-cost installation on utility poles, depends upon the availability of a cost-effective convenient method for placing and replacing cables belowground. A network of underground conduits constructed of field-assembled rigid sections, including straight segmen ...

    SBIR Phase I 2004 Department of Transportation
  4. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  5. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  6. INTEGRATION OF A SOIL IMPACT MODEL WITH KRASH

    SBC: General Engineering and Systems Analysis Co Inc (GESAC)            Topic: N/A

    DURING PHASE I, WE WILL DEVELOP AN ALGORITHM TO CALCULATE THE FORCES GENERATED DUE TO THE IMPACT OF AIRCRAFT STRUCTURES WITH SOIL. THIS ALGORITHM WILL BE INTEGRATED WITH THE CURRENT KRASH PROGRAM AS AN EXTERNAL FORCE ACTING ON THE VARIOUS MASS ELEMENTS THAT ARE DEFINED IN KRASH. THE FAILURE OF SOIL DUE TO THE IMPACT OF THE AIRCRAFT AND DRAGGING OF THE AIRCRAFT ALONG THE SURFACE WILL BE MODELLED TA ...

    SBIR Phase I 1992 Department of Transportation
  7. NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  8. Pipeline Integrity Process Management/Audit System

    SBC: AECsoft USA Inc.            Topic: N/A

    As the OPS performs audits of the pipeline operators, pursuant to the Pipeline Safety Improvement Act of 2002 and Sub-part O of the newly released 49 CFR 192, the focus is no longer on the existence of a plan, rather, it is on the existence of a process, the completion of tasks defined within those processes and the documentation that supports and/or defines the decisions associated with said acti ...

    SBIR Phase I 2004 Department of Transportation
  9. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
US Flag An Official Website of the United States Government