You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
DETECTION AND QUANTIFICATION OF SUBSURFACE CORROSION USING IMPROVED MAGNETO-OPTIC/EDDY-CURRENT IMAGING AND IMAGE PROCESSING
SBC: PHYSICAL RESEARCH, INC. Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
Enhancing the Usability of the TEXAS Model for Intersection Traffic
SBC: Rioux Engineering Topic: N/AThe TEXAS Model for Intersection Traffic is a high-quality single-intersection microscopic traffic simulation model developed at the University of Texas at Austin. It analyzes in sub microscopic detail the behavior of driver-vehicle units as they go through an intersection and intermix with other traffic flows. It has detailed intersection geometry, path following, microscopic car following, lan ...
SBIR Phase II 2006 Department of Transportation -
GPS-BASED AUTONOMOUS SPACE NAVIGATION
SBC: Arrowsmith Technologies Inc Topic: N/ACOMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...
SBIR Phase I 1992 Department of Transportation -
INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS
SBC: Omega Point Laboratorytorie Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
INTEGRATION OF A SOIL IMPACT MODEL WITH KRASH
SBC: General Engineering and Systems Analysis Co Inc (GESAC) Topic: N/ADURING PHASE I, WE WILL DEVELOP AN ALGORITHM TO CALCULATE THE FORCES GENERATED DUE TO THE IMPACT OF AIRCRAFT STRUCTURES WITH SOIL. THIS ALGORITHM WILL BE INTEGRATED WITH THE CURRENT KRASH PROGRAM AS AN EXTERNAL FORCE ACTING ON THE VARIOUS MASS ELEMENTS THAT ARE DEFINED IN KRASH. THE FAILURE OF SOIL DUE TO THE IMPACT OF THE AIRCRAFT AND DRAGGING OF THE AIRCRAFT ALONG THE SURFACE WILL BE MODELLED TA ...
SBIR Phase I 1992 Department of Transportation -
Meis System for Inspection of Pipeline Coating
SBC: HD LABORATORIES, INC. Topic: N/ACoating disbond on buried pipelines contineus to be a major problem world-wide. Disbonds left unrepaired promote both corrosion and stress-corrosion cracking, which are much more costly to repair. Improved inspection technology is currently needed to detect and characterize disbonds. HD Laboratories, Inc. proposes to refine and test a novel method of detecting and assessing coating disbonds and ...
SBIR Phase I 2006 Department of Transportation -
NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION
SBC: Stress Eng Services, Inc Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
PRODUCTIVE TERMINAL OPERATIONS
SBC: William Bradford Hubbard Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
STRUCTURES
SBC: Invocon Consultants Topic: N/AA NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...
SBIR Phase II 1992 Department of Transportation