Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  2. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
  3. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  4. STRESSMETER FOR MEASURING DYNAMIC BRIDGE STRESSES

    SBC: Re/spec Inc            Topic: N/A

    A NEED EXISTS FOR A COMPACT, PORTABLE SYSTEM CAPABLE OF MEASURING DYNAMIC STRESSES INDUCED BY HEAVY TRUCKS IN THE STRU- TURAL MEMBERS OF BRIDGES. USE OF STATE-OF-OF THE-ART ELEC- TRONIC CIRCUITRY NOW ALLOWS CONSTRUCTION OF A HYBRID ANALOG-DIGITAL INDICATOR THATCAN DISPLAY THE PEAK STRESSES A BRIDGEEXPERIENCES BY USING DATA FROM STRAIN SENSORS ATTACHED TO THE BRIDGE. THE FEASIBILITY OF BUILDING SUC ...

    SBIR Phase I 1988 Department of Transportation
  5. NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  6. ELECTROTHERMAL REFORMING OF HAZARDOUS ORGANICS AND WATER- SOLUBLE WASTES

    SBC: A1-chem Fuels Inc.            Topic: N/A

    A1-CHEM FUELS, INC. HAS A PATENT PENDING FOR AN ELECTROTHER-MAL DEVICE TO PRODUCE MEDIUM TO HIGH BTU FUEL GAS FROM WASTEHYDROCARBON SOURCES. THIS UNIT OPERATES BY PRODUCING A HIGH-VOLTAGE ALTERNATING CURRENT ELECTRIC DISCHARGE ACROSS THE INTERFACE BETWEEN A WASTE HYDROCARBON AND WATER. THE EXTREMELY HIGH TEMPERATURE WITHIN THE ELECTRICAL DISCHARGE IS SUFFICIENT TO CAUSE LOCALIZED FAST PYROLYSIS OF ...

    SBIR Phase II 1988 Environmental Protection Agency
  7. SLUDGE EVAPORATION & EXTRACTION PROCESS

    SBC: Alpha Environmental Laboratory            Topic: N/A

    BIOLOGICAL AND HAZARDOUS SLUDGES AND SLURRIES REPRESENT A MAJOR DISPOSAL PROBLEM. DEWATERING IS A MAJOR COST ELEMENT. THIS TWO-STEP TECHNOLOGY INVOLVES A FIRST STEP ACHIEVING ESSENTIALLY COMPLETE DEWATERING IN A BACKMIX REACTOR BY DISPERSION OF SLUDGE IN HEAVY OIL REACTION MEDIA MAINTAINED AT WATER VAPORIZATION TEMPERATURE USING ENERGY EFFICIENT VAPOR RECOMPRESSION. THE OXIDIZABLE IN THE VAPOR PHA ...

    SBIR Phase I 1992 Environmental Protection Agency
  8. FEASIBILITY OF AN INTEGRATED CONTINUOUS PROCESS USING AUTO- MATIC INSTRUMENTATION AND STATAISTICAL ANALYSES TO REDUCE COSTS AND TO INCREASE THE EFFICIENCY OF PEAK DETECTION AND POLLUTION CONTROL IN UNDERGROUND STORAGE TANKS

    SBC: Production Monitoring &            Topic: N/A

    N/A

    SBIR Phase I 1988 Environmental Protection Agency
US Flag An Official Website of the United States Government