Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. ANALYSIS OF STATE-OF-THE-ART METHODS FOR CONTAINMENT INTEGRATED LEAK RATE TESTING

    SBC: Sentry Equipment Corp.            Topic: N/A

    THE J.P. LANGAN & ASSOCIATES, INC/SENTRY EQUIPMENT CORP. TEAM WILL DEVELOP TWO MODELING METHODS TO ENHANCE ILRT TESTING CONFIDENCE. WE INTEND TO ESTABLISH A MATHEMATICAL RELATIONSHIP BETWEEN CONTAINMENT SIZE AND THE FREQUENCY DURATION BETWEEN DISCRETEDATA POINTS FOR IDEAL AUTOMATED DATAACOLLECTION AND EVALUATION. WE WILL SUPPORT THE PROPOSED APPENDIX J BY ANALYZING 20 TYPEA AND VERIFICATION TESTS ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
  2. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  3. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
  4. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  5. STRESSMETER FOR MEASURING DYNAMIC BRIDGE STRESSES

    SBC: Re/spec Inc            Topic: N/A

    A NEED EXISTS FOR A COMPACT, PORTABLE SYSTEM CAPABLE OF MEASURING DYNAMIC STRESSES INDUCED BY HEAVY TRUCKS IN THE STRU- TURAL MEMBERS OF BRIDGES. USE OF STATE-OF-OF THE-ART ELEC- TRONIC CIRCUITRY NOW ALLOWS CONSTRUCTION OF A HYBRID ANALOG-DIGITAL INDICATOR THATCAN DISPLAY THE PEAK STRESSES A BRIDGEEXPERIENCES BY USING DATA FROM STRAIN SENSORS ATTACHED TO THE BRIDGE. THE FEASIBILITY OF BUILDING SUC ...

    SBIR Phase I 1988 Department of Transportation
  6. NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  7. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: Kalsi Engineering, Incorporated            Topic: N/A

    THIS PROJECT IS AIMED AT DEVELOPING TECHNIQUES FOR PREDICTING CHECK VALVE PERFORMANCE AND ITS INTERNAL COMPONENTS DEGRADATION IN PRACTICAL PIPING SYSTEMS USED IN NUCLEAR POWER PLANTS. THE MAIN FOCUS OF THE EFFORT IS TO SYSTEMATICALLY EVALUATE THE EFFECT OF UPSTREAM DISTURBANCES WHICH ARE WITHIN 10 DIAMETERS UPSTREAM. BY USING A COMBINED THEORETICAL AND EXPERIMENTAL APPROACH, GENERALIZED NONDIMENSI ...

    SBIR Phase II 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government