You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  2. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  3. Microwave measurement of rail distance traveled

    SBC: Systems & Materials Research Corporation            Topic: 081FR3

    Rail vehicle distance traveled measurements don't currently meet the precision requirement of 5ft./mile. An innovative microwave technique is proposed using two X band transceiver assemblies separated by a known distance. Reflected energy from metal objects such as tie-plates or dielectric contrast between ties and rail bed are used as replicate pairs to measure the time passage between transcei ...

    SBIR Phase I 2009 Department of Transportation
  4. NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
US Flag An Official Website of the United States Government