You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Decentralized, Public, and Mobile-Based Sidewalk Inventory Tool

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: 142FH1

    Knowledge Based Systems, Inc. (KBSI) is pleased to propose the further design and development of MySidewalk mobile application facilitating the crowd-sourced collection of sidewalk inventory and condition data. The MySidewalk application utilizes advances in social networks and data mining to provide integrated sidewalk datasets. Phase I and II research was facilitated by inputs from City of Colle ...

    SBIR Phase II 2019 Department of Transportation
  2. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  3. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
  4. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  5. NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  6. AIRCRAFT SAFTEY

    SBC: SYSTEMS & ELECTRONICS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  7. HOLD

    SBC: Airdex Corpon            Topic: N/A

    THE TIME REQUIRED FOR CLEANING, DEHUMIDIFYING AND PURGING OFCARGO HOLDS HAS A DIRECT EFFECT ON THE TURN AROUND TIME OF VESSELS CARRYING MOISTURE SENSITIVE GOODS IN PORT. THIS PROPROJECT WILL THOROUGHLY RESEARCH THE REQUIREMENTS FOR DEHUMIDIFICATION, DEVELOP DESIGN CRITERIA, DESIGN CRITERIA , DESIGN A REFRIGERANT TYPE DEHUMIDIFIER, CONSTRUCT A PROTO TYPE, AND TEST THE EQUIPMENT IN THE FIELD. PARTIC ...

    SBIR Phase I 1985 Department of Transportation
  8. FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE

    SBC: Coin Systems Inc            Topic: N/A

    FEASIBILITY STUDY TO DETERMINE THE POTENTIAL OF UTILIZATION OF TELECOMMUNICATIONS, CELLULAR PHONE AND ELECTRONIC TRANSFER TECHNOLOGIES TO SIGNIFICANTLY REDUCE AND IN SOME CASES ELIMINATE THE SHRINKAGE OF COLLECTED TRANSIT REVENUE THROUGH EMPLOYEE MIS-HANDLING, EMPLOYEE FRAUD, EMPLOYEE THEFT. THIS STUDY WILL FOCUS ON THE FEASIBILITY OF IMPLEMENTING T THE ELECTRONIC/MICRO PROCESSOR BASED COLLECTION ...

    SBIR Phase I 1985 Department of Transportation
  9. COLLISION AVOIDANCE TECHNIQUE USED BY THE MAJOR RAILROADS OF THE US STILL RELY ON THE ALERTNESS OF THE LOCOMOTIVE ENGINEER TO SEE AND RESPOND TO WARNING SIGNALS DISPLAYED IN THE ENGINE COMPARTMENT AND ALONG THE RIGHT-OF-WAY.

    SBC: Expert Systems Engineers            Topic: N/A

    COLLISION AVOIDANCE TECHNIQUE USED BY THE MAJOR RAILROADS OF THE US STILL RELY ON THE ALERTNESS OF THE LOCOMOTIVE ENGINEER TO SEE AND RESPOND TO WARNING SIGNALS DISPLAYED IN THE ENGINE COMPARTMENT AND ALONG THE RIGHT-OF-WAY. SO LONG AS THE ENGINEER REMAINS ALERT, THE SYSTEM WORKS WELL, BUT WHEN THE ENGINEER IS NOT QUICK TO PERCEIVE AND REACT TO DANDER SIGNALS, THE SYSTEM FAILS. MAINTAINING ENGINEE ...

    SBIR Phase I 1985 Department of Transportation
  10. A NEW TECHNOLOGY CALLED "CHEMICAL PARAMETER SPECTROMETRY" IS MODIFIED TO BE ABLE TO ANALYZE SOLID, LIQUID, AND GASEOUSSAMPLES.

    SBC: Transducer Research Inc.            Topic: N/A

    A NEW TECHNOLOGY CALLED "CHEMICAL PARAMETER SPECTROMETRY" IS MODIFIED TO BE ABLE TO ANALYZE SOLID, LIQUID, AND GASEOUSSAMPLES. THE EXPERIMENTS PERFORMED IN THIS WORK RESULT IN THE DESIGN FOR A PROTABLE INSTRUMENT (BLACK BOX) THAT CAN IDENTIFY VIRTUALLY ALL HAZARDOUS COMMODITIES. THE HAZARD OUS SPILLS IDENTIFICATION SYSTEM IS PORTABLE, FULLY A YAUTOMATED, AND RUGGED. IT WILL IDENTIFY HAZARDOUS SUBS ...

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government