You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. On-board Smart Vision System to Support Vehicle-to-Infrastructure (V2I) Communication

    SBC: Connected Wise LLC            Topic: 180FH1

    Connected automated vehicle (CAV) technology has significant implications in terms of transportation system safety and efficiency. However, building and maintaining a wireless communication infrastructure (e.g. roadside units (RSUs), power, fiber optic lines etc.) across the U.S. is a challenging task. In urban areas, where vehicle population and vehicle-miles-traveled (VMT) are high, building suc ...

    SBIR Phase II 2019 Department of Transportation
  2. Decentralized, Public, and Mobile-Based Sidewalk Inventory Tool

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: 142FH1

    Knowledge Based Systems, Inc. (KBSI) is pleased to propose the further design and development of MySidewalk mobile application facilitating the crowd-sourced collection of sidewalk inventory and condition data. The MySidewalk application utilizes advances in social networks and data mining to provide integrated sidewalk datasets. Phase I and II research was facilitated by inputs from City of Colle ...

    SBIR Phase II 2019 Department of Transportation
  3. Guided Augmented Independence Travel Aid (GAIT-Aid)

    SBC: Design Interactive, Inc.            Topic: 180FT1

    Lack of transportation access affects approximately 30% of people with functional limitations. In fact, people with functional limitations experience transportation access barriers four times more than those without limitations. With the emerging market of low cost augmented and virtual reality technology, perceptual user interfaces (PUI) that interact more naturalistically with end-users are prov ...

    SBIR Phase II 2019 Department of Transportation
  4. Welding High Performance Bridge Steel with a Pulsed Energy Source

    SBC: KAI, LLC            Topic: 132FH1

    This proposal is in response to announcement DTRT57-13-R-SBIR2 in the area 13.2-FH1, Development of Innovative Welding for High Performance Bridge Steel. It is proposed to use Homopolar Generator (HPG) Welding to join the high performance bridge steel in the 3” by 30” cross sections mentioned in the announcement in under 1 second. All of the energy required to perform the weld is stored in the ...

    SBIR Phase I 2014 Department of Transportation
  5. COMPUTER-BASED PAVEMENT DISTRESS INDENTIFICATION SYSTEM

    SBC: Brent Rauhut Engineering Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Transportation
  6. AUTOMATED VIDEO DATA REDUCTION SYSTEM

    SBC: Dba Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1993 Department of Transportation
  7. MULTIVORTEX COLLECTOR OF EXPLOSIVE AGENTS

    SBC: Energy Innovations, Inc.            Topic: N/A

    THE OBJECTIVE IS A COMPACT, RELIABLE AND INEXPENSIVE METHOD FOR SAMPLING LARGE VOLUMES OF AIR RAPIDLY TO DETERMINE THE CONCENTRATION OF AIRBORNE EXPLOSIVES. THE APPROACH INVOLVES THE USE OF A MULTIVORTEX PRECIPITATOR CAPABLE OF EFFICIENTLY REMOVING FINE PARTICULATES AND LARGE MOLERCULES FROM THE AIR AND COLLECTING THEM FOR CONVENIENT ANALYSIS. DURING PHASE I, A PROTOTYPE WILL BE TESTED FOR COLLECT ...

    SBIR Phase I 1993 Department of Transportation
  8. NEURAL NETWORK LANE CHANGE DETECTOR

    SBC: Exodyne Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1993 Department of Transportation
  9. A MODULAR, FAULT TOLERANT, FIELD PROGRAMMABLE NAVIGATION SENSOR INTERFACE.

    SBC: Marisys, Inc.            Topic: N/A

    THE PROLIFERATION OF ELECTRONIC NAVIGATION SENSORS AND INSTRUMENTS WHICH MAKE USE OF NAVIGATIONAL DATA (ECDIS, ARPA RADAR) HAS RESULTED IN A COMPLEX DATA SHARING PROBLEM. EFFORTS AMONG MANUFACTURERS AND TRADE ORGANIZATIONS HAVE RESULTED IN A SET OF INTRA-DEVICE COMMUNICATIONS STANDARDS WHICH GREATLY SIMPLIFY THE INTEGRATION TASK. EACH SHIPBOARD INSTALLATION HAS SPECIFIC REQUIREMENTS WHICH ARE NOT ...

    SBIR Phase I 1993 Department of Transportation
  10. DESIGN STUDY FOR A REDUCED ENERGY AND SIZE, PULSED DEUTERON ACCELERATOR FOR USE IN A PFNA EXPLOSIVES DETECTION SYSTEM.

    SBC: National Electrostatics Corp.            Topic: N/A

    A PROTOTYPE FOR AN EXPLOSIVE DETECTION SYSTEM USING PULSED FAST NEUTRON ACTIVATION (PFNA) TECHNIQUES USES AN ELECTROSTATIC TANDEM ACCELERATOR TO PRODUCE NANOSECOND WIDTH PULSES OF 6 MEV DEUTERONS. WHILE THIS APPROACH ALLOWS ONE TO PRODUCE NEUTRONS OF AN ENERGY SUITED TO THE REACTION ONE HOPES TO EXCITE IN SAMPLE ATOMS OF INTEREST, IT REQUIRES THE USE OF A FAIRLY LARGE AND EXPENSIVE ACCELERATOR SYS ...

    SBIR Phase I 1993 Department of Transportation
US Flag An Official Website of the United States Government