You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Decentralized, Public, and Mobile-Based Sidewalk Inventory Tool

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: 142FH1

    Knowledge Based Systems, Inc. (KBSI) is pleased to propose the further design and development of MySidewalk mobile application facilitating the crowd-sourced collection of sidewalk inventory and condition data. The MySidewalk application utilizes advances in social networks and data mining to provide integrated sidewalk datasets. Phase I and II research was facilitated by inputs from City of Colle ...

    SBIR Phase II 2019 Department of Transportation
  2. A Low Cost Sensor for Mid-Chord Offset Measurements

    SBC: En'urga Inc.            Topic: 141FR1

    This Phase I SBIR project will evaluate the feasibility of utilizing low cost and high accuracy local position sensors and transmitters to autonomously estimate Mid-chord offset in rails. The two innovative parts of the proposed system are (1) a set of miniature and highly accurate local position sensors and transmitters for estimating the absolute positions of the mid point and end points of a 62 ...

    SBIR Phase I 2014 Department of Transportation
  3. Welding High Performance Bridge Steel with a Pulsed Energy Source

    SBC: KAI, LLC            Topic: 132FH1

    This proposal is in response to announcement DTRT57-13-R-SBIR2 in the area 13.2-FH1, Development of Innovative Welding for High Performance Bridge Steel. It is proposed to use Homopolar Generator (HPG) Welding to join the high performance bridge steel in the 3” by 30” cross sections mentioned in the announcement in under 1 second. All of the energy required to perform the weld is stored in the ...

    SBIR Phase I 2014 Department of Transportation
  4. Cost Effective, Power Efficient, Wireless Sensor Network Based Highway Incident Detection & Warning System

    SBC: Central Signal LLC            Topic: 07FH4

    More than 52% of U.S. urban highway congestion is a direct result of highway incidents. Federal and State transportation authorities are searching for quick, cost-effective and efficient highway incident detection and warning systems. Several solutions have been proposed but none could satisfy requirements of transportation authorities. Central Signal's research and development, grounded in mor ...

    SBIR Phase II 2009 Department of Transportation
  5. A Miniature Non-Contact Rail Temperature Sensor

    SBC: En'urga Inc.            Topic: 081FR2

    The Phase I SBIR project will evaluate the feasibility of utilizing a low cost sensor to obtain rail temperatures from a moving train. The two innovative parts of the proposed sensor are (1) a rugged four wavelenght high frequency sensor that accurately measures the natural radiation emitted by the rails, and (2) an advanced algorithm that provides a emissivity compensated temperature from these ...

    SBIR Phase I 2009 Department of Transportation
  6. Microwave measurement of rail distance traveled

    SBC: Systems & Materials Research Corporation            Topic: 081FR3

    Rail vehicle distance traveled measurements don't currently meet the precision requirement of 5ft./mile. An innovative microwave technique is proposed using two X band transceiver assemblies separated by a known distance. Reflected energy from metal objects such as tie-plates or dielectric contrast between ties and rail bed are used as replicate pairs to measure the time passage between transcei ...

    SBIR Phase I 2009 Department of Transportation
  7. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  8. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
  9. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  10. NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
US Flag An Official Website of the United States Government