You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Decentralized, Public, and Mobile-Based Sidewalk Inventory Tool

    SBC: KNOWLEDGE BASED SYSTEMS INC            Topic: 142FH1

    Knowledge Based Systems, Inc. (KBSI) is pleased to propose the further design and development of MySidewalk mobile application facilitating the crowd-sourced collection of sidewalk inventory and condition data. The MySidewalk application utilizes advances in social networks and data mining to provide integrated sidewalk datasets. Phase I and II research was facilitated by inputs from City of Colle ...

    SBIR Phase II 2019 Department of Transportation
  2. GPS-BASED AUTONOMOUS SPACE NAVIGATION

    SBC: Arrowsmith Technologies Inc            Topic: N/A

    COMMERCIAL AND GOVERNMENT SPACE TRANSPORTATION SYSTEMS DEPEND ON GROUND SUPPORT FOR NAVIGATION. THE GROUND SOLUTION CAN BE COSTLY AND MAY PROVIDE LESS ACCURACY THAN NEEDED. A GPS-BASED REAL-TIME AUTONOMOUS SPACECRAFT NAVIGATION SYSTEM IS PROPOSED. AN ALGORITHM WILL BE DEVELOPED WHICH COMBINES GPS-DERIVED POINT POSITION ESTIMATES WITH A PROPAGATED A PRIORI POSITION ESTIMATE. THE POINT POSITIONS ARE ...

    SBIR Phase I 1992 Department of Transportation
  3. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    A NEED EXISTS TO MONITOR VIBRATION IN HIGHWAY BRIDGES. IT IS DESIRABLE TO MONITOR MANY POINTS ON THE BRIDGE. THE CURRENT PROBLEM IS THAT SENSORS MUST BE WIRED TO A CENTRAL LOCATION. WIRE IS DIFFICULT TO INSTALL AND TO MOVE. THE SOLUTION IS TO COLLECT SENSOR DATA BY RADIO. A SYSTEM EXISTS THAT ELIMINATES WIRE. IT GATHERS SENSOR DATA TO A CENTRAL LOCATION BY RADIO. THE SYSTEM'S UNIQUE FEATURE IS THA ...

    SBIR Phase II 1992 Department of Transportation
  4. INNOVATIVE FIRE RESISTANT ("FIREPROOFING") COATINGS FOR USE ON COMPOSITE PRODUCTS ABOARD U.S. COMMERCIAL SHIPS

    SBC: Omega Point Laboratorytorie            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  5. NONDESTRUCTIVE TESTING OF DRILLED SHAFTS USING PATTERN RECOGNITION

    SBC: Stress Eng Services, Inc            Topic: N/A

    N/A

    SBIR Phase I 1992 Department of Transportation
  6. NEURAL NETWORK LANE CHANGE DETECTOR

    SBC: Exodyne Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  7. STRUCTURES

    SBC: Invocon Consultants            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  8. BLADDERS FOR SPILL CONTAINMENT

    SBC: Pasadyn Inc            Topic: N/A

    BLADDER TYPE DEVICES ARE USED TO MITIGATE FLUID LOSSES FROM RUPTURED STORAGE DEVICES.

    SBIR Phase I 1991 Department of Transportation
  9. INVESTIGATION OF STRUCTURAL ADHESIVES

    SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC.            Topic: N/A

    THIS PROJECT IS DESIGNED TO FURNISH FHWA WITH A NUMBER OF IMPORTANT PRODUCTS IN PREPARATION FOR ACCELERATED LIFE TESTING (ALT) OF A LARGE SCALE MODEL JOINT AND A LONG TERM FULL SCALE BEAM TEST TO VERIFY THE ALT. THE MOST IMPORTANT PRODUCT IS A PROCEDURE FOR INTRODUCING DESIRED MOISTURE LEVELS INTO LARGE AREA BONDS IN A RELATIVELY SHORT TIME. A SECOND PRODUCT IS THE ALT PLAN WHICH ACCOUNTS FOR THE ...

    SBIR Phase II 1991 Department of Transportation
US Flag An Official Website of the United States Government