  1. A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS

    SBC: Amparo Corp.on            Topic: N/A

    PHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...

    SBIR Phase I 1994 Department of Energy
  2. A HIGH POWER SOLID-STATE AMPLIFIER

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  3. THE PERIPHERAL COMPONENT INTERCONNECTION/SCALABLE COHERENT INTERFACE BRIDGE FOR DATA ACQUISITION AND COMPUTATION APPLICATIONS

    SBC: BI RA SYSTEMS, INC            Topic: N/A

    COALESCING THE FRAGMENTED INFORMATION ASSOCIATED WITH EACH EVENT OF A HIGH-ENERGY PHYSICS DETECTOR AND THEN PROCESSING IT AT THE RATES DEMANDED BY ACCELERATOR SYSTEMS ARE AMONG THE LARGEST CHALLENGES IN THE PHYSICS COMMUNITY. NEW DETECTOR SYSTEMS CONTINUE TO INCREASE THE NUMBER OF MEASURED PARAMETERS AND SIMULTANEOUSLY INCREASE THE RESOLUTION OF DETECTOR COMPONENTS SO THAT THE VOLUME OF GENRATED ...

    SBIR Phase I 1994 Department of Energy
  4. FORECASTING RESERVOIR THICKNESS WITH FRACTALS

    SBC: Nw Resources            Topic: N/A

    THE NATION DESIRES TO EXPAND THE USE OF CLEAN BURNING, COMPETITIVELY PRICED NATURAL GAS. THE INCREASED DEMAND FOR NATURAL GAS HAS PROMPTED NEW DRILLING IN ESTABLISHED GAS FIELDS. THE PROPER PLACEMENT OF THE NEW WELLS IS DEPENDENT ON THE GAS FORMATION PROPERTIES BETWEEN THE EXISTING WELLS. ONE OF THE PROPERTIES IS THE THICKNESS OF THE GAS BEARING ZONE. IT IS GENERALLY ACCEPTED THAT THE FORMATIO ...

    SBIR Phase I 1994 Department of Energy
  5. A HIGH-PERFORMANCE CRYOGENIC HEAT EXCHANGER

    SBC: CREARE LLC            Topic: N/A

    RECUPERATIVE HEAT EXCHANGERS ARE KEY COMPONENTS IN REFRIGERATION SYSTEMS USED TO COOL SUPERCONDUCTING DEVICES IN HIGH ENERGY PHYSICS RESEARCH. PRESENT PLATE-FIN HEAT EXCHANGERS HAVE EFFECTIVENESS OF AROUND 0.97 AND PRESSURE DROPS OF SEVERAL PERCENT OF THE STREAM PRESSURE. APPROXIMATELY HALF THE LOSSES IN A CRYOGENIC REFRIGERATOR ARE THE RESULTS OF INEFFECTIVENESS AND PRESSURE DROP IN THE HEAT EXCH ...

    SBIR Phase II 1994 Department of Energy
  6. HELIUM-COOLED DIVERTORS WITH LOW ACTIVATION MATERIALS AND SIMPLE FABRICATION TECHNIQUES

    SBC: CREARE LLC            Topic: N/A

    HELIUM COOLING IS ATTRACTIVE FOR HIGH HEAT FLUX COMPONENTS IN TOKAMAK FUSION REACTORS BECAUSE THERE ARE LARGE SAFETY ADVANTAGES COMPARED TO WATER COOLANT. HOWEVER, CURRENT TECHNOLOGY FOR HELIUM COOLING IS HAMPERED BY THE COMPLEXITY OF THE HOUSING REQUIRED TO PROVIDE HELIUM TO THE NORMAL FLOW HEAT EXCHANGER AND BY THE USE OF MATERIALS WHICH BECOME HIGHLY RADIOACTIVE WHEN OPERATED IN THE ENVIRONMENT ...

    SBIR Phase II 1994 Department of Energy
  7. DEVELOPMENT OF METAL HYDRIDE MATERIALS FOR HIGH COEFFICIENT OF PERFORMANCE HEAT PUMPS

    SBC: Thermal Electric Devices Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  8. A FRAMEWORK FOR A GENERAL PURPOSE INTELLIGENT CONTROL SYSTEM FOR PARTICLE ACCELERATORS

    SBC: Vista Control Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  9. A MULTIMEDIA TUTORIAL FOR CHARGED-PARTICLE BEAM DYNAMICS

    SBC: Whistlesoft Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  10. HEAVY METAL REMEDIATION OF SOIL USING PERMEABLE CHELATION BARRIERS

    SBC: T P L, INC            Topic: N/A

    REMEDIATION OF SOIL AND GROUNDWATER TO REDUCE HEAVY METAL CONTAMINANTS TO BACKGROUND LEVELS POSES A SERIOUS CHALLENGE. CONVENTIONAL METHODS ARE ABLE TO REDUCE CONTAMINATION LEVELS, BUT TOTAL REMEDIATION, DEFINED AS ACHIEVEMENT OF BACKGROUND LEVELS OF THE METAL, MAY NOT BE ECONOMICALLY FEASIBLE. A PERMEABLE CHELATION BARRIER CONTAINING SILICA GEL MODIFIED TO CHELATE HEAVY METALS PROVIDES AN ECONO ...

    SBIR Phase I 1994 Department of Energy