  1. Solid Waste Remediation System (SWRS) for Small Contingency Base Camps

    SBC: Altex Technologies Corporation            Topic: OSD12EP2

    To meet the requirements of the Army Solid Waste Remediation System, for Small Contingency Base Camps, Altex has developed a Compact Ward Furnace Energy Recovery System (CWFERS), which was proven feasible by testing and analysis, under a Phase I award. The system reduces fuel consumption by 92% fuel, compared to a traditional remediation system, and converts the energy in the bulk waste to hot wa ...

    SBIR Phase II 2013 Department of DefenseOffice of the Secretary of Defense
  2. DEVELOPMENT OF A DYNAMIC OPERATIONAL RISK MODEL TO SUPPORT RISK MANAGEMENT OF NUCLEAR POWER PLANTS

    SBC: Accident Prevention Group            Topic: N/A

    CURRENT ACTIVITY WITHIN THE NRC AND THE NUCLEAR INDUSTRY SEEKS TO EXPLOIT THE BENEFITS OF PRA IN RISK-BASED APPROACHES TO RELIEVE REGULATORY BURDEN ON THE ECONOMICALLY THREATENED NUCLEAR POWER PLANTS. THE ACCIDENT PREVENTION GROUP HAS BEEN DEVELOPING THE CONCEPT OF AN INTEGRATED RISK MANAGEMENT PROGRAM (IRMP) TOWARD SUCH GOALS. A KEY ELEMENT OF AN IRMP IS AN "OPERATIONAL RISK MODEL" OF THE NPP THA ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  3. DEVELOPMENT OF A METHODOLOGY FOR ANALYZING PRECURSORS TO EARTHQUAKE-INITIATED AND FIRE-INITIATED ACCIDENT SEQUENCES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. SMART WATER-REACTIVE GROUTS FOR UNDERGROUND ENTOMBMENT FACILITIES

    SBC: Guyer Santin, Inc.            Topic: N/A

    THIS PROPOSAL IS TO ADDRESS THE FEASIBILITY OF WATER-REACTIVE GROUTS AS A "SMART" MATERIAL CAPABLE OF BEING PLACED DURING CONSTRUCTION BUT NOT ACTIVATED UNTIL A THREAT EVENT OCCURS WHICH DEGRADES THE ORIGINAL WATERTIGHT INTEGRITY. WHEN SUCH DEGRADATION OCCURS, IT WILL EXPOSE THE WATER-REACTIVE GROUT TO GROUNDWATER. THIS WILL TRIGGER THE HARDENING PROCESS WHICH WILL AUTOMATICALLY AFFECT A EAL AT TH ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. CONTROL ROOM INLEAKAGE TEST

    SBC: Lagus Applied Technology Inc.            Topic: N/A

    A SIMPLIFIED RECONNAISSANCE-TYPE TEST IS PROPOSED THAT UTILIZES THE TECHNIQUES OF TRACER GAS VENTILATION TESTING TO QUANTIFY THE UNFILTERED AIR INLEAKAGE INTO AN OPERATING NUCLEAR POWER PLANT CONTROL ROOM. THE TEST WILL BE DEVELOPED TO ENCOMPASS THE FIVE BASIC TYPES OF CONTROL ROOM EMERGENCY VENTILATION SYSTEMS. A THOROUGH ERROR ANALYSIS WILL ALSO BE UNDERTAKEN. A DETAILED TESTING PROTOCOL SUITABL ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  6. MEASUREMENT BASED DEPENDABILITY ANALYSIS FOR DIGITAL SYSTEMS

    SBC: SOHAR, INC.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  7. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC.            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...