You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. HLA Federation Implementation Tools

    SBC: Aegis Technologies Group, LLC, The            Topic: N/A

    The Defense Modeling and Simulation Office (DMSO) has developed the High Level Architecture (HLA) as one of the principle components of a DoD-wide Common Technical Framework for modeling and simulation (M&S). Unlike previous distributed simulation technologies such as DIS and SIMNET, HLA provides federation developers, via the Object Model Template (OMT), the means to define the structure and for ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  2. Integration of III-V Semiconductor Optical Sources with Electro-optic Polymer Waveguide Devices Using Micromachined Reflective Elements

    SBC: Aegis Technologies Group, LLC, The            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseArmy
  3. Phase Signature Antenna Drive Diagnostics System

    SBC: AI Signal Research, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseArmy
  4. 6-DOF Isolation and Excitation Facility

    SBC: Amtec Corporation            Topic: N/A

    This sponsoring agency has defined the need for a six degree-or-freedom (6DOF) magnetically levitated (maglev) test platform to be used for vibration analysis. The intended payload can range in mass from 1Kg to 1000kg and i size up to one meter by one meter at the base. Peak linear acceleration of 5 g's and strokes of 25 mm (peak-peak) are required. The platform should also be capable of simult ...

    SBIR Phase I 1996 Department of DefenseArmy
  5. Applied Filtering Lab

    SBC: Applied Filtering Laboratory.            Topic: N/A

    The adaptive single user receiver invented at AF LAB has been shown to suppress multiuser and certain forms of narrow-band interference in adecision directed mode during the entire transmission, without requiring knowledge of other users spreading codes, timing or phase information in direct-sequence proposal, we investigate the use of our single user receiver for secure communications as required ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  6. Non-Eroding Fin Materials

    SBC: Applied Research Associates, Inc.            Topic: N/A

    This project will analyze and select promising materials and designs to be used in the plumes of tactical solid rocket motors for missile steering and control. The emphasis is on high-performance refractory materials and compatibility of material systems. The control fins experience severe thermal and severe particulate erosion environments. Missile controllability requires fins with minimal er ...

    SBIR Phase I 1996 Department of DefenseArmy
  7. A Dialectic Approach to Intelligence Data Fusion For Threat Identification

    SBC: BEVILACQUA RESEARCH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of DefenseArmy
  8. High-Efficiency X-Ray Source

    SBC: BIO-IMAGING RESEARCH, INC.            Topic: N/A

    While the efficiency of x-ray sources is defined by the laws of physics, present day sources do not take full advantage of those laws. Other materials thant tungsten are not only more efficient in producing bremsstrahlung, but have "characteristic" x-rays that can make the beam harder instead of softer (as in the case for tungsten). Today's tubes also do not use optimum angles for the incident e ...

    SBIR Phase I 1996 Department of DefenseArmy
  9. Lightweight Small 3-10 kw, 120 Vac, 60 Hz, Diesel Generator Sets

    SBC: Centrair Corp            Topic: N/A

    Objective is to develop the preliminary design and existing component modification required to integrate a 3-10 kw generator assembly using the newly patented new bold Turbo Rotary Powered Diesel Engine with a VSCF alternator that will have minimal 3 kw, 120 Vac, 50/60 Hz, 3 Phase power output up to 10 Kw, 120 Vac, 50/60 Hz, 3 phase output (depending ont he load requirement) in a lightweight compo ...

    SBIR Phase I 1996 Department of DefenseArmy
  10. Low Cost, High Pressure, Electric Metering Centrifugal Pump for Liquid Fueled, Expendable, Tactical Missile Propulsion Systems

    SBC: CFD RESEARCH CORPORATION            Topic: N/A

    An electrically driven high head rise centrifugal pump is proposed. Ongoing component technology development indicates this system will be required to meet next generation expendable Air-Turbo-Ramjet (ATR), Liquid Fuel RamJet (LFRJ) and turboJet missile propulsion engine requirements. During Phae I CFDRC will collaborate with Northern Research Engineering to: 1. design and fabricate a prototype ...

    SBIR Phase I 1996 Department of DefenseArmy
US Flag An Official Website of the United States Government