You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. METAL MONOLITHS FOR CONVERSION OF NATURAL GAS TO LIQUID FUEL

    SBC: Alabama Cryogenic Engineering, Inc.            Topic: N/A

    ADVANCED METHODS FOR THE CONVERSION OF NATURAL GAS TO LIQUID FUELS ARE NEEDED SO THAT NATURAL GAS ENERGY RESOURCES CAN BE BETTER UTILIZED. IN RECENT RESEARCH BREAKTHROUGHS, CERAMIC MONOLITHS HAVE BEEN USED IN PARTIAL OXIDATION TO CATALYZE VERY FAS, HIGH SELECTIVITY SYNTHESIS OF HIGHER HYDROCARBONS FROM METHANE. USE OF METAL MONOLITHS (SOLID METAL PLATES PERFORATED WITH SMALL, UNIFORM HOLES) IS P ...

    SBIR Phase I 1994 Department of Energy
  2. A HIGH POWER THICK TARGET DESIGN FOR IRRADIATION BY HIGH INTENSITY CHARGED PARTICLE BEAMS

    SBC: Amparo Corp.on            Topic: N/A

    PHASE I ADDRESSES A NEW APPROACH FOR THE DESIGN OF HIGH POWER NUCLEAR TARGETS USED FOR PRODUCTION OF RADIOISOTOPES BY HIGH ENERGY CHARGED PARTICLE BEAMS, NOTABLY HIGH ENERGY PROTONS. SUCH TARGETS WILL YIELD LARGER QUANTITIES OF RADIOACTIVE SPECIES THAN PRESENTLY AVAILABLE, EITHER FOR BASIC RESEARCH (E.G., STUDIES USING RADIOACTIVE BEAMS) OR FOR APPLIED PURPOSES (E.G., PRODUCTION OF MEDICAL RADIOI ...

    SBIR Phase I 1994 Department of Energy
  3. A HIGH POWER SOLID-STATE AMPLIFIER

    SBC: Amparo Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  4. THE PERIPHERAL COMPONENT INTERCONNECTION/SCALABLE COHERENT INTERFACE BRIDGE FOR DATA ACQUISITION AND COMPUTATION APPLICATIONS

    SBC: BI RA SYSTEMS, INC            Topic: N/A

    COALESCING THE FRAGMENTED INFORMATION ASSOCIATED WITH EACH EVENT OF A HIGH-ENERGY PHYSICS DETECTOR AND THEN PROCESSING IT AT THE RATES DEMANDED BY ACCELERATOR SYSTEMS ARE AMONG THE LARGEST CHALLENGES IN THE PHYSICS COMMUNITY. NEW DETECTOR SYSTEMS CONTINUE TO INCREASE THE NUMBER OF MEASURED PARAMETERS AND SIMULTANEOUSLY INCREASE THE RESOLUTION OF DETECTOR COMPONENTS SO THAT THE VOLUME OF GENRATED ...

    SBIR Phase I 1994 Department of Energy
  5. AN APPARATUS FOR STRUCTURAL ANALYSIS OF HIGH TEMPERATURE MATERIALS USING SYNCHROTRON RADIATION

    SBC: Containerless Research, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  6. HUMAN PRESENCE DETECTION IN VEHICLES

    SBC: ENSCO Inc            Topic: N/A

    AN EXISTING SYSTEM HAS DEMONSTRATED, IN QUIET CONDITIONS, VERY RELIABLE DETECTION OF HUMANS HIDDEN IN VEHICLES. SEISMIC VIBRATIONS ARE THE MAJOR, UNAVOIDABLE LIMITATIONS. MEASUREMENT OF THE SEISMIC VIBRATIONS AND COHERENT ANALYSES WILL BE UTILIZED TO COMPUTE AND SUBTRACT THE EFFECT OF THE SEISMIC INTERFERENCE ON THE VEHICLE MOTION. THE PHASE I EFFORT WILL IMPROVE THE RELIABILITY, INCREASE THE S ...

    SBIR Phase I 1994 Department of Energy
  7. RELIABLE INTRUSION DETECTION

    SBC: ENSCO Inc            Topic: N/A

    RELIABLE INTRUSION DETECTION MAY BE ACHIEVED BY COMBINING GENERALIZED POTENTIAL FUNCTION (GPF) NEURAL NET CONSTRUCTION AND MULTIPLE SENSOR DATA FUSION. TRADITIONALLY, RELIABLE INTRUSION DETECTION CAN BE DIFFICULT BECAUSE NOISE LEVELS CHANGE WITH TIME AND LOCATION, AND AN INTRUSION MAY PRODUCE A WIDE RANGE OF SIGNALS OR VARIATIONS OVER THE DIFFERENT TYPES OF SENSORS. ACCOMMODATING THESE VARIATION ...

    SBIR Phase I 1994 Department of Energy
  8. LAMINAR FLOW ELECTROSTATIC PRECIPITATION

    SBC: ENVIRONMENTAL ELEMENTS CORP.            Topic: N/A

    REGULATIONS GOVERNING THE CONTROL OF PARTICULATE EMISSIONS ARE BECOMING INCREASINGLY STRICT IN TERMS OF THE CONTROL EFFICIENCIES THEY REQUIRE. SEVERAL DRIVING FORCES ARE RESPONSIBLE FOR THIS TREND, FOREMOST OF WHICH IS THE NEED TO CONTROL TOXIC AIR EMISSIONS, SUCH AS TRACE METALS AND HEAVY ORGANIC COMPOUNDS. OTHER DRIVING FORCES INCLUDE THE AMBIENT AIR QUALITY REGULATIONS AND STATE AND LOCAL REG ...

    SBIR Phase I 1994 Department of Energy
  9. FLUE GAS CLEANUP USING A NOVEL CORONA GENERATOR

    SBC: ENVIRONMENTAL ELEMENTS CORP.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  10. SAPPHIRE-METAL JOINING FOR LOW-LOSS GYROTRON WINDOWS

    SBC: Fm Technologies Inc            Topic: N/A

    A NEW TECHNIQUE, PULSED ELECTRON BEAM (PEB) JOINING, WILL BE APPLIED TO THE PROBLEM OF JOINING, LOW-LOSS CERAMIC MATERIALS USED FOR WINDOWS IN HIGH FREQUENCY MICROWAVE DEVICES TO THE METAL VACUUM ENVELOPE OF THE MICROWAVE DEVICE. THE PEB TECHNIQUE ALLOWS SELECTIVE HEATING OF THE SPECIMEN TO BE JOINED THROUGH PREFERENTIAL ENERGY DEPOSITION THAT IS CONTROLLED BY A COMBINATION OF THE ELECTRON BEAM P ...

    SBIR Phase I 1994 Department of Energy
US Flag An Official Website of the United States Government