You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Abductive Electronics Prognostic Tool (ADEPT)

    SBC: ABTECH CORPORATION            Topic: N/A

    AbTech Corporation proposes to apply its unique Statistical Network ModelingTM technology to develop a non contact prognostic assessment tool that 1) acquires, processes, and analyzes electronic radiated signal data, 2) learns the expected characteristics and patterns of specific radiated signals measured from microelectronic semiconductor devices using AbTech's statistical network modeling techno ...

    SBIR Phase I 1997 Department of DefenseAir Force
  2. ABDUCTIVE/EXPERT SYSTEM CONTROLLER

    SBC: ABTECH CORPORATION            Topic: N/A

    THE OBJECTIVE OF THIS EFFORT IS TO DEMONSTRATE A PROTOTYPE CONTROLLER FOR A HOWITZER USING A HYBRID NETWORK AND PRODUCTION RULE SYSTEM. THE RESULTING ADAPTIVE CONTROLLER WILL DEMONSTRATE THE FEASIBILITY OF DEVELOPING A REVOLUTIONARY CONTROLLER CAPABLE OF ADAPTING IN A DYNAMIC ENVIRONMENT, MONITORING AND DIAGNOSING BEHAVIOR, AND PREDICTING FUTURE FAULTS AND MAINTENANCE REQUIREMENTS. ABTECH HAS DEVE ...

    SBIR Phase II 1994 Department of DefenseArmy
  3. Abductive Power System Control and Diagnostics

    SBC: ABTECH CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 National Aeronautics and Space Administration
  4. A Beginning Sign Language VideoCourse for Hearing Adult Learners

    SBC: The Masters Group            Topic: N/A

    This Phase I project will consist of a fesibility study in preparation for Phase II project in which a complete 20-hour sign language videocourse will be produced reflecting the entry level skills, learning styles, learning preferences, and sign-processing strategies of hearing adult beginning learners. The primary hearing populations for this instruction are (a) current and prospective teachers ...

    SBIR Phase II 1997 Department of Education
  5. A Beginning Sign Language VideoCourse for Hearing Adult Learners

    SBC: The Masters Group            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Education
  6. A carrier phase processor (CPP) for high dynamics carrier phase navigation

    SBC: TRACKING & IMAGING SYSTEMS, INC.            Topic: N/A

    JDAM and similar DGPS based military applications impose tight error budgets on PPS receivers. Validation of these capabilities proves challenging with traditional ground-based and GPS-based reference systems. Available carrier-phase DGPS systems have great potential as reference systems, but their response to signal blockage and high dynamics is poor. Simple cascaded IMU formulations are inade ...

    SBIR Phase II 1997 Department of DefenseNavy
  7. A carrier phase processor (CPP) for high dynamics carrier phase navigation

    SBC: TRACKING & IMAGING SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseNavy
  8. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    41299 November 19, 1996 FM Technologies, Inc. In the Relativistic Klystron Two-Beam Accelerator, which is currently under development, power from a low-energy, high-current, bunched beam is converted to micro-waves via the klystron mechanism and used to provide power for a high-energy linac, specifically a future Next Linear Collider upgrade to l.0 TeV. ...

    SBIR Phase II 1997 Department of Energy
  9. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  10. Accurate Characterization of Composite Strength Through Empirical and Progressive Damage Methods

    SBC: Atherotech, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Health and Human Services
US Flag An Official Website of the United States Government