You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Decision Support System to Enhance Performance in Decision-Making Teams

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    In an information-rich environment, the possibility of enhancing the decision-making processes and outcomes is closely tied to the proper and timely management and analysis of information. In a team decision making environment coopertion, communication, collaboration, shared situational awareness and mental models become critical parameters for success. Computer technology, hardware and software ...

    SBIR Phase I 1997 Department of DefenseAir Force
  2. Data Mining and Integration Technologies for Information Exploitation

    SBC: DEUMBRA, INC.            Topic: N/A

    We shall deliver an information exploitation demonstration prototype simulatirsg actual rlata exploitation. Within this prototype we shall deliver five different types of capabilities. The first three capabilities are data mining tools. These tools shall demonstrate the capability of identifying electronic patterns or f ingerprints in data, relationships between data, and visualizations of such ...

    SBIR Phase I 1997 Department of DefenseAir Force
  3. Data Mining Techniques for Plan Sentinel Development

    SBC: DEUMBRA, INC.            Topic: N/A

    We propose a plan sentinel prototype consisting of three components. The first component is the development of a plan mining tool which identifies and computes false or missing assumptions and deviations to plans and time phased tasks. The second component, the annotated database, computes plans which the plan mining tool access and parses into a logical annotated rule set. Finally, MAVIS, a to ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
  4. Abductive Electronics Prognostic Tool (ADEPT)

    SBC: ABTECH CORPORATION            Topic: N/A

    AbTech Corporation proposes to apply its unique Statistical Network ModelingTM technology to develop a non contact prognostic assessment tool that 1) acquires, processes, and analyzes electronic radiated signal data, 2) learns the expected characteristics and patterns of specific radiated signals measured from microelectronic semiconductor devices using AbTech's statistical network modeling techno ...

    SBIR Phase I 1997 Department of DefenseAir Force
  5. Hybrid Statistical Network/Expert System Approach for Advanced Data Fusion

    SBC: ABTECH CORPORATION            Topic: N/A

    The human brain processes information from several sensors of the body and extracts meaningful information about the environment. Likewise, the ability to fuse multilevel, multifaceted processes dealing with the association, correlation, and combination of data from single or multiple sources is desired to attain state and identity estimates in a timely manner. However, current data fusion techniq ...

    SBIR Phase I 1997 Department of DefenseAir Force
  6. Active Noise Reduction Headphones for In-Situ Audiometry Testing

    SBC: Adaptive Technologies, Inc.            Topic: N/A

    Active noise reduction (ANR) headsets have found a market niche in the hearing protection industry, thereby validating the technology of active noise control for personal applications. This Phase I project will seek to extend the application of personal ANR systems to include specialized headphones which can successfully evaluate hearing acuity in typical clinical environments. To ensure a succe ...

    SBIR Phase I 1997 Department of DefenseAir Force
  7. Fast-Acting Cryogenic Injection Valves for Pulse Detonation

    SBC: Adroit Systems, Inc.            Topic: N/A

    The opportunity addressed in this proposal is a fast-acting cryogenic injection valve for pulse detonation rocket engines (PDREs), which are predicted to significantly out-perform current state-of-the-art chemical deflagrative rocket propulsion systems. The developed valve would allow high mass flow rates to be achieved with fast response times, all at minimum cost, weight, power, and volume. Th ...

    SBIR Phase I 1997 Department of DefenseAir Force
  8. Diamond-like Nanocomposites as Wear Resistant, Low Friction Coatings for Cryogenic Coolers

    SBC: ADVANCED REFRACTORY TECHNOLOGIES, INC.            Topic: N/A

    A new class of thin film coating materials, diamond-like nanocomposites (DLN) have been developed. These materials have a combination of properties making them an excellent choice for use as wear resistant coatings on mechanical cryogenic coolers for space applications. In particular, the reliability and maintainability of conventional mechanical coolers could be enhanced by engineering the surf ...

    SBIR Phase I 1997 Department of DefenseAir Force
  9. Full Band Acoustic Localization Processing

    SBC: Advanced Acoustic Concepts, Inc.            Topic: N/A

    This Phase I project will investigate the feasibility of a submarine passive localization system which will localize and track short duration intentional and unintentional emissions from submarines and weapons. The approach combines radius of curvature ranging using time delay measurements from an array of hull mounted hydrophones with a multi hypothesis tracking algorithm for resolution of a ...

    SBIR Phase I 1997 Department of DefenseNavy
  10. Nanoelectric Modeling Software Development

    SBC: Advanced Device Technologies,            Topic: N/A

    This Phase I project has two primary objectives. The first objective is to develop an engineering model of Resonant Tunneling Devices (RTD) to be implemented in AIM-Spice, a commercial software package running under Windows 95/NT. The development of a reliable device model is a prerequisite for the design and production of any semiconductor device technology. The RTD model will be a semi-empiri ...

    SBIR Phase I 1997 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government