You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Disposable Micromachined Flow Immunoassay for Field Detection of Contaminants

    SBC: American Research Corporation of Virginia            Topic: N/A

    The use of enzyme-linked immunosorbent assay (ELISA) to detect contaminants such as solvents, fuels, and pesticides in soil and water samples is now well established. Although ELISA and related methods can facilitate analysis of samples, several washing and separation steps are involved that require 30 to 120 minutes per sample to reach equilibrium. Recently, near infrared fluorescence immunoassa ...

    SBIR Phase I 1997 Environmental Protection Agency
  2. Treatment of Produced Water from Coal-Bed Methane Production Using Carbon Aerogel Technology

    SBC: Bpf, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Environmental Protection Agency
  3. ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.

    SBC: Corpe Corp.            Topic: N/A

    AT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  4. Development of a Multianalyte Biosensor Instrument

    SBC: Ergopedia, Inc.            Topic: N/A

    This Phase I project will develop a multianalyte biosensor field screening instrument (MBFI). The MBFI has the potential to reduce the annual cost of environmental analyses in the United States by more than $20 million and to reduce the analysis turnaround time from approximately 19 days to less than 15 minutes. The major barrier to the development of a biosensor instrument for environmental mea ...

    SBIR Phase I 1997 Environmental Protection Agency
  5. ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM

    SBC: EPOCH ENGINEERING, INC.            Topic: N/A

    WHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  6. Novel Fiber Optic Biosensor for Pesticide Residue Detection

    SBC: LUNA INNOVATIONS INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1996 Environmental Protection Agency
  7. DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA

    SBC: Frh, Inc.            Topic: N/A

    CHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...

    SBIR Phase I 1994 Nuclear Regulatory Commission
  8. Novel Field Deployable Electrochemical Sensor for the Detection and Long-Term Monitoring of Pollutants

    SBC: LYNNTECH INC.            Topic: N/A

    Chlorinated hydrocarbons represent the most prevalent contaminants of groundwater in the country. When released in the subsurface, they tend to persist below the water table, and it can take decades or centuries before slow-moving groundwater completely dissolves accumulations of chlorinated solvent product. Analytical methods currently available for monitoring these compounds require extensive ...

    SBIR Phase I 1997 Environmental Protection Agency
  9. Low Cost Heavy Metals Removal from Hazardous Wastewaters

    SBC: LYNNTECH INC.            Topic: N/A

    Heavy metal species mobilized and released into the environment by technological activities tend to persist indefinitely, circulating and eventually accumulating throughout the food chain, posing a serious threat to the environment, animals, and humans. Typical industrial metal-containing discharges can be considered as point-source emissions, which in turn offer the possibility of feasible remed ...

    SBIR Phase I 1997 Environmental Protection Agency
  10. Self Contained Electrochemical System for Treating Paint Residue

    SBC: LYNNTECH INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Environmental Protection Agency
US Flag An Official Website of the United States Government