You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MEASUREMENT OF RESIDUAL RADIOACTIVE CONTAMINATION BY 2-D LASER HEATED TLD

    SBC: International Sensor            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  2. TIME DOMAIN REFLECTOMETRY LIQUID LEVEL DETECTION DATA EVALUATION AND CONCEPT ASSESSMENT

    SBC: Mohr And Associates            Topic: N/A

    N/A

    SBIR Phase I 1984 Nuclear Regulatory Commission
  3. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  4. COMBINING LASER MEASUREMENTS WITH BACKWARD WAVE TECHNIQUES FOR EVALUATION OF UNDERGROUND OPENINGS IN OIL SHALE

    SBC: Sigma Research Corp            Topic: N/A

    SUCCESSFUL COMMERCIALIZATION OF OIL SHALE WILL INVOLVE LARGESCALE UNDERGROUND MINING OR RETORTING, AND WILL REQUIRE SUPPORT TECHNOLOGY TO EVALUATE THE INTEGRITY OF SUPPORT PILLARS, MINE ROOF ROCK, AND OTHER LARGE STRUCTURES IN OIL SHALE. IN ORDER TO ELIMINATE TIME CONSUMING AND OBTRUSIVE EVALUATION METHODS INVOLVING CONTRACT TYPE DETECTORS (GEOPHONES, ACCELEROMETERS, ETC.), IT IS PROPOSED HERE THA ...

    SBIR Phase II 1984 Nuclear Regulatory Commission
  5. AN ULTRA-HIGH SPEED RESIDUE NUMBER PROCESSOR FOR SAFT INSPECTION SYSTEM IMAGE ENHANCEMENT

    SBC: Sigma Research Corp            Topic: N/A

    A REAL-TIME DATA PROCESSING ENHANCEMENT TO EXISTING SAFT INSPECTION SYSTEMS IS PROPOSED THROUGH THE DEVELOPMENT OF A SPECIAL PURPOSE RESIDUE-NUMBER-SYSTEM (RNS) PROCESSOR. BECAUSE OF THE REGULARITY IN THE ARCHITECTURE AND CLOCKING OF RNS ARITHMETIC ELEMENTS, A HIGH DEGREE OF COMPUTATIONAL PARALLISM AND PIPELINING IS POSSIBLE RESULTING IN A CONSIDERABLE INCREASE IN THROUGHPUT AND COMPUTATIONAL RATE ...

    SBIR Phase II 1984 Nuclear Regulatory Commission
  6. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    THE DIFFICULTY IN PREDICTING STRUCTURAL DEGRADATION RATES FOR NUCLEAR POWER PLANT COMPONENTS DUE TO CORROSION AND OTHER FACTORS HAS LED TO THE NEED FOR COSTLY, TIME CONSUMING INSPECTIONS AND INCREASED COST FROM INTENTIONALLY OVERDESIGNED COMPONENTS. THE SITUATION INDICATES A SERIOUS, UNMET NEED FOR A SIMPLE BUT ACCURATE SYSTEM FOR REAL- TIME, IN SITU, NONDESTRUCTIVE ANALYSIS OF NUCLEAR POWER PLANT ...

    SBIR Phase II 1994 Nuclear Regulatory Commission
  7. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. CONTROL VALVE CAVITATION GUIDE

    SBC: Tullis Engineering Consultants            Topic: N/A

    ONE OF THE IMPORTANT UNRESOLVED OPERATIONAL PROBLEMS AT NUCLEAR POWER PLANTS IS CAVITATION IN CONTROL VALVES. EACH YEAR COSTLY SHUTDOWNS ARE NECESSARY TO REPAIR VALVES DAMAGED BY CAVITATION. THE PROBLEM IS MORE THAN JUST AN ECONOMICAL BURDEN ON THE UTILITY, IT CAN CREATE SAFETY-RELATED PROBLEMS BECAUSE A VALVE DAMAGED BY CAVITATION MAY NOT BE ABLE TO PERFORM ITS INTENDED FUNCTION. THE PRIMARY REAS ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government