You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Photovoltaic Case for Electrical Equipment
SBC: ENERGY CONVERSION DEVICES, INC. Topic: N/AThe objective of this project is to design, fabricate, and test a prototype photovoltaic (PV) case for electrical equipment used in field operations. The PV case could charge the equipment's batteries and/or directly operate low power equipment such as receivers and computers without a battery. The case would incorporate ECD's unique lightweight, flexible, and very rugged amorphous silicon PV modu ...
SBIR Phase I 1994 Department of DefenseSpecial Operations Command -
Investigation of Molded Photovoltaic Case
SBC: ENERGY CONVERSION DEVICES, INC. Topic: N/AN/A
SBIR Phase I 1994 Department of DefenseSpecial Operations Command -
MEASUREMENT OF RESIDUAL RADIOACTIVE CONTAMINATION BY 2-D LASER HEATED TLD
SBC: International Sensor Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
CONTINUOUS SPECTROGRAPHIC ANALYSIS OF VANADOUS AND VANADIC IONS
SBC: Omni Tech International Ltd Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
Non-Invasive Battery State-of-Charge Sensor
SBC: Power Sciences, Inc. Topic: N/AThe operational readiness of critical equipment often depends on the integrity of the battery subsystem. A small magnitude magnetic field, generated by a coil, can be used to monitor the state-of-charge and possibley long-term state-of-health of batteries. The proposed work will determine the feasibility of using a non-invasive sensor-external to a battery - and not connected to it's terminals. ...
SBIR Phase I 1996 Department of DefenseSpecial Operations Command -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
DEVELOPMENT OF A CONTAMINATION MONITOR USING VISUAL IDENTIFICATION
SBC: Shonka Research Associates Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
CONTROL VALVE CAVITATION GUIDE
SBC: Tullis Engineering Consultants Topic: N/AONE OF THE IMPORTANT UNRESOLVED OPERATIONAL PROBLEMS AT NUCLEAR POWER PLANTS IS CAVITATION IN CONTROL VALVES. EACH YEAR COSTLY SHUTDOWNS ARE NECESSARY TO REPAIR VALVES DAMAGED BY CAVITATION. THE PROBLEM IS MORE THAN JUST AN ECONOMICAL BURDEN ON THE UTILITY, IT CAN CREATE SAFETY-RELATED PROBLEMS BECAUSE A VALVE DAMAGED BY CAVITATION MAY NOT BE ABLE TO PERFORM ITS INTENDED FUNCTION. THE PRIMARY REAS ...
SBIR Phase I 1992 Nuclear Regulatory Commission