You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY22 is not expected to be complete until September, 2023.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.
SBC: Corpe Corp. Topic: N/AAT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
HIGH SENSITIVITY URANIUM BIOASSAY
SBC: Eastern Analytical Inc. Topic: N/ADETERMINATION OF URANIUM IN THE URINE OF WORKERS IS REQUIRED BY THE NRC AT NUCLEAR FACILITIES. EXTREMELY LOW CONCENTRATIONS OF URANIUM, ESPECIALLY IN SMALL SAMPLES, ARE DIFFICULT TO MEASURE USING EXISTING TECHNOLOGY. FUTURE NRC PLANS TO CHARACTERIZE BIOAVAILABLE URANIUM FRACTIONS COMPRISING THE URANIUM BODY BURDEN WILL REQUIRE EVEN HIGHER SENSITIVITIES. HIGH SENSITIVITY TECHNOLOGY DEVELOPED FOR UR ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM
SBC: EPOCH ENGINEERING, INC. Topic: N/AWHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA
SBC: Frh, Inc. Topic: N/ACHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
MEASUREMENT OF RESIDUAL RADIOACTIVE CONTAMINATION BY 2-D LASER HEATED TLD
SBC: International Sensor Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
FOLLOWING A POST-IRRADIATION THERMAL ANNEAL CYCLE
SBC: Materials Engineering & Topic: N/ATHIS RESEARCH WILL DETERMINE THE CHARACTERISTICS OF FATIGUE INITIATION LIFE, FATIGUE CRACK GROWTH RATES, AND SLOW-STABLECRACK EXTENSIONS FOLLOWING A POST-IRRADIATION ANNEAL. FATIGUE INTITIATION LIFE WILL BE DETERMINED WITH SMOOTH SPECIMENS OF 308 STAINLESS STEEL WHICH HAVE BEEN ANNEALED AND THEN CYCLED IN PRESSURIZED, HIGH-TEMPERATURE WATER. SUBMERGED ARC WELD STEEL (LINDE 80 FLUX) WILL BE PARTIAL ...
SBIR Phase I 1983 Nuclear Regulatory Commission -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
AN ULTRA-HIGH SPEED RESIDUE NUMBER PROCESSOR FOR SAFT INSPECTION SYSTEM IMAGE ENHANCEMENT
SBC: Sigma Research Corp Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
COMBINING LASER MEASUREMENTS WITH BACKWARD WAVE TECHNIQUES FOR EVALUATION OF UNDERGROUND OPENINGS IN OIL SHALE
SBC: Sigma Research Corp Topic: N/AN/A
SBIR Phase I 1983 Nuclear Regulatory Commission -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, Inc. Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission