You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
MEASUREMENT OF RESIDUAL RADIOACTIVE CONTAMINATION BY 2-D LASER HEATED TLD
SBC: International Sensor Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
BUNDLES UNDER LOW REFLOOD RATES AND BOIL OFF CONDITIONS
SBC: Mohr And Associates Topic: N/ATHIS PROGRAM DEALS WITH USING THE DIGITIZED VIDEO TDR LIQUIDLEVEL DATA PREPARED UNDER CONTRACT (NRC-04-84-146) OF THE MEMT-4 TEST FROM THE LOCA SIMULATION IN NRU PROGRAM. THESE NEW DATA AND TECHNIQUES WILL BE APPLIED TO ESTIMATE THE VOIDFRACTION, LIQUID LEVEL, AND LOCAL HEAT TRANFER CONDITIONS FOR THE OTHER NRU TESTS WHERE ONLY SELF POWERED NEUTRON DETECTORS (SPND'S) AND THERMOCOUPLE DATA ARE AVAI ...
SBIR Phase I 1985 Nuclear Regulatory Commission -
CONTROL VALVE CAVITATION GUIDE
SBC: Tullis Engineering Consultants Topic: N/AONE OF THE IMPORTANT UNRESOLVED OPERATIONAL PROBLEMS AT NUCLEAR POWER PLANTS IS CAVITATION IN CONTROL VALVES. EACH YEAR COSTLY SHUTDOWNS ARE NECESSARY TO REPAIR VALVES DAMAGED BY CAVITATION. THE PROBLEM IS MORE THAN JUST AN ECONOMICAL BURDEN ON THE UTILITY, IT CAN CREATE SAFETY-RELATED PROBLEMS BECAUSE A VALVE DAMAGED BY CAVITATION MAY NOT BE ABLE TO PERFORM ITS INTENDED FUNCTION. THE PRIMARY REAS ...
SBIR Phase I 1992 Nuclear Regulatory Commission