You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
A HIGH RESOLUTION CDTE ARRAY MONITORING SYSTEM FOR MONITORING CONTAMINATION IN SOILS
SBC: Radiation Safety Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF A NEURAL NETWORK-BASED INCLUSION SIMULATION MODEL
SBC: Syndicates Inc. Topic: N/AVARIABLES THAT MIGHT LEAD TO WIDER ADOPTION OF INTEGRATED PRESCHOOL PROGRAMS INCLUDE EXPANSION OF THE WAY IN WHICH WE MAKE DECISIONS AND THE MANNER IN WHICH RELATED SERVICES ARE DELIVERED. EVALUATION EFFORTS SHOULD BE EXPANDED TO INCLUDE THE IMPACT OF VARYING METHODS OF INTEGRATION. THIS PROJECT PROPOSES THE DEVELOPMENT OF A COMPUTER INCLUSION SIMULATION MODEL THROUGH THE UTILIZATION OF NEURAL N ...
SBIR Phase I 1994 Department of Education -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
ADAPTATION AND DEVELOPMENT OF HYPERCARD/VIDEODISK TECHNOLOGIES TO FACILITATE INDIVIDUALIZED MULTISENSORY LEARNING EXPERIENCES FOR INDIVIDUALS WITH DISABILITIES
SBC: The Tuckerman Group Inc Topic: N/ATHIS PROJECT EXAMINES THE ABILITY OF A COMPUTER BASED LEARNING AID TO ADAPT TO THE INDIVIDUAL, LEARNING DISABLED CHILD BY CHANGING THE MANNER IN WHICH IT PRESENTS SUBJECT MATTER. THE ABILITY OF COMPUTER BASED SYSTEMS TO QUICKLY ADAPT, WITHLITTLE OR NO EXTERNAL INSTRUCTION, TO DIFFERING SITUATIONS, OFFERS CONSIDERABLE PROMISE FOR THE LEARNING DISABLED. THESE CHILDREN TYPICALLY REQUIRE HIGHLY PERSON ...
SBIR Phase I 1990 Department of Education -
RESTORATION OF THE COMPETITIVE CAPABILITY AND PROFITABILITY OF RANDOLPH SHEPPARD VENDOR BUSINESSES BY INTRODUCING INNO-VATIVE EQUIPMENT TECHNOLOGIES AND NEW FOODSERVICE MARKETING PROGRAMS AND PRODUCT CONCEPTS.
SBC: General Research And Analysis Topic: N/AFOR 50 YEARS THE RANDOLPH-SHEPPARD VENDING PROGRAM HAS MEANTEMPLOYMENT AND INDEPENDENCE TO THE BLIND. TODAY, HOWEVER, THE PROGRAMS AND ITS VENDOR MEMBERS FACE SEVERE CHANGES IN THE BUSINESS ENVIRONMENT THAT THREATEN THE LONG TERM ECO-NOMIC STABILITY OF MANY INDIVIDUAL OPERATORS AND PERHAPS THEENTIRE PROGRAM. THIS NEW BUSINESS ENVIRONMENT FEATURES IN- TENSIFIED COMPETITION FROM THE PRIVATE SECTOR, ...
SBIR Phase I 1988 Department of Education -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission