You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ACOUSTIC DETECTION OF AXLES

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    THE OBJECTIVE OF THIS PHASE I RESEARCH IS TO DETERMINE THE FEASIBILITY OF UTILIZING ACOUSTIC RADIATION FROM VEHICLE TIRES TO PROVIDE A LOW COST, EASY TO DEPLOY, UNOBTRUSIVE, RELAIBLE REPLACEMENT FOR THE CURRENT METHOD OF COLLECTING VEHICLE AXLE PASSAGE DATA. THE PROPOSED METHOD WILL CROSS-CORRELATE THE TIRE NOISE RECEIVED AT SPATIALLY SEPARATED MICROPHONES TO LOCATE AXLE CROSSINGS. THE PROCESSING ...

    SBIR Phase I 1994 Department of Transportation
  2. ADVANCED FARE PAYMENT MEDIA

    SBC: Glh Inc            Topic: N/A

    THE SBIR PROGRAM SOLICITATION PROVIDES AN OPPORTUNITY TO DESIGN AND DEVELOP A FARE PAYMENT SYSTEM BASED ON ADVANCED FARE PAYMENT MEDIA TO MEET THE NEEDS OF TRANSIT PATRONS AND SYSTEMS IN THE 1990S. THE SOLICITATION STATED THE NEW MEDIASHOULD: BE COST EFFECTIVE, PERMIT PAYMENT OF ZONAL FARES, INCREASE FLEXIBILITY IN PAYMENT SCHEDULES AND METHODS, AND IMPROVE REVENUE SECURITY AND PROCESSING CAPABILI ...

    SBIR Phase I 1991 Department of Transportation
  3. AIRBORNE DATA LINK COCKPIT MANAGEMENT AND DISPLAY

    SBC: CARLOW INTERNATIONAL, INC.            Topic: N/A

    RESEARCH WILL BE CARRIED OUT ON INFORMATION REQUIREMENTS ANDFLIGHT CREW PERFORMANCE IN RELATION TO FUTURE DATA LINK COMMUNICATIONS (DLC) SYSTEMS. IT IS EXPECTED THAT AVAILABILITY OF CRITICAL INFORMATION IN THE COCKPIT FROM DLC SYSTEMS WILL FACILITATE IMPROVED TRANSPORTATION EFFICIENCY AND SAFETY. HOWEVER, THERE MAY BE SOME PRICE IN TERMS OF CREW WORKLOAD. TASK ANALYSIS AND HUMAN FACTORS INFORMATIO ...

    SBIR Phase I 1991 Department of Transportation
  4. AN YTTRIUM ALUMINUM PEROVSKITE BASED GAMMA-RAY DOSIMETER

    SBC: W Peter Trower Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Nuclear Regulatory Commission
  5. A Proposal to Develop the UTD Breakaway Link for Use in Utility Pole Guy Wires

    SBC: UTD, INC.            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
  6. DYNAMIC GPS ATTITUDE DETERMINING SYSTEM FOR MARINE APPLICATIONS

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  7. Feasibility Study of an Internet-Based GUI for Highway Capacity Software

    SBC: Viggen Corp.on            Topic: N/A

    In this proposal, the Viggen Project Team presents an elegant approach to developing a truly portable Graphical User Interface (GUI) for the Highway Capacity Software (HCS). Our approach is based on the emerging Internet-driven computing technology and will be totally platform-independent. The prototype will be developed using a programming language called Java and users will be able to execute ...

    SBIR Phase II 1997 Department of Transportation
  8. Feasibility Study of an Internet-Based GUI for Highway Capacity Software

    SBC: Viggen Corp.on            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Transportation
  9. FLIGHT INSPECTION INNOVATIONS

    SBC: Systems Control Technology,            Topic: N/A

    FLIGHT INSPECTION OF AIR NAVIGATION FACILITIES DURING COMMISSIONING, AND FOR PERIODIC REINSPECTION PURPOSES, IS ONE OF THE PRIMARY FUNCTIONS OF THE FAA RELATED TO SUPPORTING INSTRUMENT FLIGHT PROCEDURES. THE FAA NOW FINDS ITSELF AT A CROSSROADS. FLIGHT INSPECTION IS A COSTLY AND RESOURCE-LIMITED ACTIVITY UNDER WHICH CURRENT RESOURCES ARE ALREADY STRAINED. WITH THE IMPENDING IMPLEMENTATION OF NUMBE ...

    SBIR Phase I 1991 Department of Transportation
  10. High Resolution Data Sources and Applications for Transportation Planning

    SBC: Shenandoah Mountain            Topic: N/A

    N/A

    SBIR Phase I 1997 Department of Transportation
US Flag An Official Website of the United States Government