You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. THE PERIPHERAL COMPONENT INTERCONNECTION/SCALABLE COHERENT INTERFACE BRIDGE FOR DATA ACQUISITION AND COMPUTATION APPLICATIONS

    SBC: BI RA SYSTEMS, INC            Topic: N/A

    COALESCING THE FRAGMENTED INFORMATION ASSOCIATED WITH EACH EVENT OF A HIGH-ENERGY PHYSICS DETECTOR AND THEN PROCESSING IT AT THE RATES DEMANDED BY ACCELERATOR SYSTEMS ARE AMONG THE LARGEST CHALLENGES IN THE PHYSICS COMMUNITY. NEW DETECTOR SYSTEMS CONTINUE TO INCREASE THE NUMBER OF MEASURED PARAMETERS AND SIMULTANEOUSLY INCREASE THE RESOLUTION OF DETECTOR COMPONENTS SO THAT THE VOLUME OF GENRATED ...

    SBIR Phase I 1994 Department of Energy
  2. A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles

    SBC: Commercial Electronics, Inc.            Topic: N/A

    86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...

    SBIR Phase I 1997 Department of Energy
  3. FORECASTING RESERVOIR THICKNESS WITH FRACTALS

    SBC: Nw Resources            Topic: N/A

    THE NATION DESIRES TO EXPAND THE USE OF CLEAN BURNING, COMPETITIVELY PRICED NATURAL GAS. THE INCREASED DEMAND FOR NATURAL GAS HAS PROMPTED NEW DRILLING IN ESTABLISHED GAS FIELDS. THE PROPER PLACEMENT OF THE NEW WELLS IS DEPENDENT ON THE GAS FORMATION PROPERTIES BETWEEN THE EXISTING WELLS. ONE OF THE PROPERTIES IS THE THICKNESS OF THE GAS BEARING ZONE. IT IS GENERALLY ACCEPTED THAT THE FORMATIO ...

    SBIR Phase I 1994 Department of Energy
  4. A Novel Mass Spectrometer for Characterization of Electrochemical Processes

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    63 A Novel Mass Spectrometer for Characterization of Electrochemical Processes--Southwest Sciences, Inc., 1570 Pacheco Street, Suite E-11, Santa Fe, NM 87505-3937; (505) 984-1322 Dr. David S. Bomse, Principal Investigator Mr. Alan C. Stanton, Business Official DOE Grant No. DE-FG03-97ER82478 Amount: $75,000 Electrochemical processes are important to a wide variety of energy related systems suc ...

    SBIR Phase I 1997 Department of Energy
  5. A Real Time Hydrocarbon Emissions Sensor for Hybrid Electric Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    40963 November 19, 1996 Southwest Sciences, Inc. Hybrid electric vehicles equipped with an auxiliary engine have shown extended driving range and better energy efficiency than electric vehicles equipped with only a standard electric power train. However, combustion exhaust from the auxiliary engine is subject to stringent emission standards that require i ...

    SBIR Phase I 1996 Department of Energy
  6. Advanced Water Sensor for Unmanned Aerial Vehicles

    SBC: SOUTHWEST SCIENCES INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  7. HEAVY METAL REMEDIATION OF SOIL USING PERMEABLE CHELATION BARRIERS

    SBC: TPL, INC            Topic: N/A

    REMEDIATION OF SOIL AND GROUNDWATER TO REDUCE HEAVY METAL CONTAMINANTS TO BACKGROUND LEVELS POSES A SERIOUS CHALLENGE. CONVENTIONAL METHODS ARE ABLE TO REDUCE CONTAMINATION LEVELS, BUT TOTAL REMEDIATION, DEFINED AS ACHIEVEMENT OF BACKGROUND LEVELS OF THE METAL, MAY NOT BE ECONOMICALLY FEASIBLE. A PERMEABLE CHELATION BARRIER CONTAINING SILICA GEL MODIFIED TO CHELATE HEAVY METALS PROVIDES AN ECONO ...

    SBIR Phase I 1994 Department of Energy
  8. DEVELOPMENT OF METAL HYDRIDE MATERIALS FOR HIGH COEFFICIENT OF PERFORMANCE HEAT PUMPS

    SBC: Thermal Electric Devices Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Energy
  9. Metal-Binding Silica Materials for Wastewater Cleanup

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  10. Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System

    SBC: Vista Control Systems, Inc.            Topic: N/A

    145 Analysis of Accelerator Tuning Algorithms for Integration with an Automatic Planning and Control System--Vista Control Systems, Inc., 134-B Eastgate Drive, Los Alamos, NM 87544-3304; (505) 662-2484 Mr. Michael Kroupa, Principal Investigator Mr. Peter N. Klout, Business Official DOE Grant No. DE-FG03-97ER82506 Amount: $74,999 Particle accelerators have moved from being strictly a research ...

    SBIR Phase I 1997 Department of Energy
US Flag An Official Website of the United States Government