You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
BREAKAWAY LUMINAIRE SUPPORT FOR MINI-CARS
SBC: Adian Engineering Corp. Topic: N/AN/A
SBIR Phase I 1988 Department of Transportation -
WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR
SBC: Airsport Corp. Topic: N/AN/A
SBIR Phase I 1994 Department of Transportation -
COMMERCIAL SPACE LAUNCH FREQUENCY REQUIRMENTS
SBC: Berner, Lanphier & Assoc Inc. Topic: N/AN/A
SBIR Phase I 1994 Department of Transportation -
ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.
SBC: Corpe Corp. Topic: N/AAT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
TRANSIT SYSTEM COMPUTER SIMULATION MODELS
SBC: Decision Dynamics, Inc. Topic: N/ATHIS PROPOSAL DESCRIBES A MICRO-LEVEL STRATEGIC TRANSIT SIMULATION MODEL THAT QUANTIFIES THE DIFFICULT TRADEOFFS BETWEEN COST, PERFORMANCE AND TIME. THE MODEL UTILIZES SYSTEM DYNAMICS TO CAPTURE THE COMPLEX, NON-LINEAR FEEDBACK STRUCTURE THAT GOVERNS SYSTEM BEHAVIOR, INCORPORATING SUCH TRANSIT OPERATIONS AS VEHICLE MANAGEMENT, SERVICE LEVELS, FARES, RIDERSHIP, MARKETING, REVENUES, CONGESTION, POLL ...
SBIR Phase I 1994 Department of Transportation -
Digital Waveform-based System for AE Measurement for NDT
SBC: Dvp, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation -
HIGH SENSITIVITY URANIUM BIOASSAY
SBC: Eastern Analytical Inc. Topic: N/ADETERMINATION OF URANIUM IN THE URINE OF WORKERS IS REQUIRED BY THE NRC AT NUCLEAR FACILITIES. EXTREMELY LOW CONCENTRATIONS OF URANIUM, ESPECIALLY IN SMALL SAMPLES, ARE DIFFICULT TO MEASURE USING EXISTING TECHNOLOGY. FUTURE NRC PLANS TO CHARACTERIZE BIOAVAILABLE URANIUM FRACTIONS COMPRISING THE URANIUM BODY BURDEN WILL REQUIRE EVEN HIGHER SENSITIVITIES. HIGH SENSITIVITY TECHNOLOGY DEVELOPED FOR UR ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
A LASER-BASED HIGH SENSITIVITY EXPLOSIVES DETECTOR
SBC: Eastern Analytical Inc. Topic: N/AN/A
SBIR Phase I 1992 Department of Transportation -
RESTRICTED VISIBILITY WARNING SYSTEM
SBC: Ecotek International Topic: N/AECOTEK INTERNATIONAL PROPOSES AN ALL SOLID-STATE VISIBILITY MONITORING SYSETM THAT WILL BE USED TO MONITOR VISIBILITY CONDITIONS ALONG ROADWAYS AND WARN TRAVELERS OF LOW VISIBILITY CONDITIONS. THE PURPOSE OF THE SYSTEM IS TO REDUCE THE NUMBER OF MULTIPLE-VEHICLE COLLISIONS AND CONSEQUENT FATALITIES, INJURIES, AND PROPERTY DAMAGES. THE SYSTEM IS BASED ON AN INNOVATIVE APPROACH TO A WELL-ESTABLISHED ...
SBIR Phase I 1994 Department of Transportation -
ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM
SBC: EPOCH ENGINEERING, INC. Topic: N/AWHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...
SBIR Phase I 1994 Nuclear Regulatory Commission