You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR
SBC: Airsport Corp. Topic: N/AN/A
SBIR Phase I 1994 Department of Transportation -
IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES
SBC: Compu Simulation & Anal I Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission -
RESTRICTED VISIBILITY WARNING SYSTEM
SBC: Ecotek International Topic: N/AECOTEK INTERNATIONAL PROPOSES AN ALL SOLID-STATE VISIBILITY MONITORING SYSETM THAT WILL BE USED TO MONITOR VISIBILITY CONDITIONS ALONG ROADWAYS AND WARN TRAVELERS OF LOW VISIBILITY CONDITIONS. THE PURPOSE OF THE SYSTEM IS TO REDUCE THE NUMBER OF MULTIPLE-VEHICLE COLLISIONS AND CONSEQUENT FATALITIES, INJURIES, AND PROPERTY DAMAGES. THE SYSTEM IS BASED ON AN INNOVATIVE APPROACH TO A WELL-ESTABLISHED ...
SBIR Phase I 1994 Department of Transportation -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission -
ADVANCED VACUUM INSULATION FOR REFRIGERATED SHIPPING CONTAINERS
SBC: Re/Spec Inc. Topic: N/AA RESEARCH PROGRAM IS PROPOSED TO DETERMINE THE FEASIBILITY OF USING ADVANCED VACUUM INSULATIONS TO IMPROVE THE PRODUCTIVITY OF REFRIGERATED SHIPPING CONTAINERS WHILE AVOIDING THE ENVIRONMENTAL RISKS ASSOCIATED WITH CHLOROFLUOROCARBONS (CFC'S) IN FOAM INSULATION CURRENTLY BEING USED. ADVANCED VACUUM INSULATIONS, CURRENTLY UNDER RESEARCH AND DEVELOPMENT, DO NOT CONTAIN CFC'S AND HAVE VERYHIGH THERM ...
SBIR Phase I 1990 Department of Transportation -
MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS
SBC: Risk Management Systems Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
MEASURING LIVE LOAD STRESSES ON BRIDGES
SBC: SCIENCE & ENGINEERING ASSOC., INC. Topic: N/AN/A
SBIR Phase I 1988 Department of Transportation -
A NOVEL MASS SPECTROMETER FOR THE DETECTION OF VAPORS FROM EXPLOSIVE, INCENDIARIES AND NOXIOUS GASES
SBC: SOUTHWEST SCIENCES INC Topic: N/ASOUTHWEST SCIENCIES, INC. PROPOSES A NOVEL MASS SPECTROMETRIC METHOD, * IONIZATION ENERGY MODULATED MASS SPECTROMETRY (IEMMS), FOR THE RAPID DETECTION OF VAPORS FROM EXPLOSIVES, INCENDIARIES AND NOXIOUS GASES. IEMMS COMBINES ELECTRON IMPACT IONIZATION USING A MONOCHROMATIC ELECTRON BEAM WITH ION DETECTION USING TWIN TIME-OF-FLIGHT (TOF) MASS ANALYZERS. ONE ANALYZER QUANTIFIES POSITIVE IONS WHILE T ...
SBIR Phase I 1992 Department of Transportation -
A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS
SBC: TPL, INC Topic: N/AN/A
SBIR Phase I 1992 Nuclear Regulatory Commission