You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. WEIGHING TRUCK COMBINATIONS IN MOTION, SOLELY ON THE TRACTOR

    SBC: Airsport Corp.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
  2. INFLATABLE PADDING FOR HARD SURFACES IN VEHICLE INTERIORS

    SBC: Concept Analysis Corp            Topic: N/A

    OCCUPANT INJURY CAN BE SIGNIFICANTLY REDUCED BY THE INCORPORATION OF PADDING OF HARD SURFACES IN VEHICLE INTERIORS. SEVERAL INTERIOR HARD SURFACES SUCH AS ROOF HEADER, A-PILLAR, AND B-PILLAR ARE DIFFICULT TO PAD DUE TO LIMITED SPACE. WAT IS NEEDED IS AN INFLATABLE PLASTIC BI-LAYER THAT COULD BE ATTACHED TO HARD SURFACES AND GIVE ACCEPTABLE WEAR AND APPEARANCE WHEN UNINFLATED, YET BE INFLATABLE DUR ...

    SBIR Phase I 1990 Department of Transportation
  3. RESTRICTED VISIBILITY WARNING SYSTEM

    SBC: Ecotek International            Topic: N/A

    ECOTEK INTERNATIONAL PROPOSES AN ALL SOLID-STATE VISIBILITY MONITORING SYSETM THAT WILL BE USED TO MONITOR VISIBILITY CONDITIONS ALONG ROADWAYS AND WARN TRAVELERS OF LOW VISIBILITY CONDITIONS. THE PURPOSE OF THE SYSTEM IS TO REDUCE THE NUMBER OF MULTIPLE-VEHICLE COLLISIONS AND CONSEQUENT FATALITIES, INJURIES, AND PROPERTY DAMAGES. THE SYSTEM IS BASED ON AN INNOVATIVE APPROACH TO A WELL-ESTABLISHED ...

    SBIR Phase I 1994 Department of Transportation
  4. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  5. CONTINUOUS SPECTROGRAPHIC ANALYSIS OF VANADOUS AND VANADIC IONS

    SBC: Omni Tech International Ltd            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  6. ADVANCED VACUUM INSULATION FOR REFRIGERATED SHIPPING CONTAINERS

    SBC: Re/Spec Inc.            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED TO DETERMINE THE FEASIBILITY OF USING ADVANCED VACUUM INSULATIONS TO IMPROVE THE PRODUCTIVITY OF REFRIGERATED SHIPPING CONTAINERS WHILE AVOIDING THE ENVIRONMENTAL RISKS ASSOCIATED WITH CHLOROFLUOROCARBONS (CFC'S) IN FOAM INSULATION CURRENTLY BEING USED. ADVANCED VACUUM INSULATIONS, CURRENTLY UNDER RESEARCH AND DEVELOPMENT, DO NOT CONTAIN CFC'S AND HAVE VERYHIGH THERM ...

    SBIR Phase I 1990 Department of Transportation
  7. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  8. DEVELOPMENT OF AN OPTICAL FIBER DYNAMIC SURFACE GEOMETRY MEASUREMENT ARRAY

    SBC: Robert A Denton Inc            Topic: N/A

    DYNAMIC QUANTIFICATION OF THE THREE-DIMENSIONAL SURFACE GEOMETRY OF ANTHROPOMORPHIC TEST DEVICES CAN IMPROVE CURRENT INJURY ASSESSMENT CAPABILITIES. PRESENTLY, A CHEST BAND CONSISTING OF MANY STRAIN GAUGES MOUNTED IN A MEMBRANE ARRAY IS BEING USED TO MEASURE DEFORMATION OF THE TORSO. WHILE THIS TECHNIQUE PROVIDES REASONABLE DATA, IT INCREASES THE COSTOF DATA ACQUISITION AND THE TIME TO PERFORM THE ...

    SBIR Phase I 1992 Department of Transportation
  9. MEASURING LIVE LOAD STRESSES ON BRIDGES

    SBC: SCIENCE & ENGINEERING ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Transportation
  10. HIGHWAY FOG WARNING SYSTEM

    SBC: SENTEC CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of Transportation
US Flag An Official Website of the United States Government