You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SCALABLE DIRECT ACCESS FRAME BUFFER

    SBC: Access Dynamics, Inc.            Topic: N/A

    CURRENT FRAME BUFFER TECHNOLOGY IS NOT OPTIMIZED FOR USE WITH GENERAL PURPOSE PROCESSORS. THIS PROPOSAL IS FOR A PROGRAM TO DEVELOP A BREADBOARD FRAME BUFFER WHICH IS EFFICIENTLY ACCESSED BY SUCH PROCESSORS. THE FRAME BUFFER IS BASED ON THE VME BUS AND IS SCALABLE TO LARGE AMOUNTS OF IMAGE MEMORY AND VERY FAST IMAGE ACQUISITION RATES. ALL IMAGE DATA IS RANDOMLY ACCESSIBLE AT HIGH SPEED. ANTICIPATE ...

    SBIR Phase I 1992 Department of DefenseDefense Advanced Research Projects Agency
  2. COST REDUCTION DESIGNS OF A LARGE RANGE OF HIGH PERFORMANCE PM ALTERNATORS AND CONTROLS WITH A PARALLEL EMPHASIS ON...

    SBC: Active Technologies Inc.            Topic: N/A

    FOUR BEARINGLESS, SHAFT MOUNTED GENERATORS WITH OUTPUTS OF 10, 100, 500 AND 1000 WATTS OF 12-15 V DC WILL BE DESIGNED AND COMPUTER MODELED TO BE DRIVEN BY MODEL AIRPLANE SIZE RECIPROCATING ENGINES. DESIGN COMBINATIONS OF IRONLESS DISK AND IRON LAMINATION CYLINDRICAL GENERATORS USING RARE EARTH AND CERAMIC PERMANENT MAGNETS WILL BE MODELED FOR RELIABILITY WITH THE LOWEST WEIGHT AT THE HIGHEST EFFIC ...

    SBIR Phase II 1992 Department of DefenseDefense Advanced Research Projects Agency
  3. COST REDUCTION DESIGNS OF A LARGE RANGE OF HIGH PERFORMANCE PM ALTERNATORS AND CONTROLS WITH A PARALLEL EMPHASIS ON...

    SBC: Active Technologies Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  4. A Three Dimensional Flow Parallel-Processing System for Fast Programmable Real-Time Applications

    SBC: 3D-Computing, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of Energy
  5. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    40640 November 12, 1996 Adherent Technologies, Inc. Scintillators have been used for over 90 years to detect ionizing radiation, but solid organic scintillator, commonly used in physics experimentation, suffer from errors caused by pulse pileup. To minimize this problem, this project will examine a new class of polymeric materials which also offer the po ...

    SBIR Phase II 1997 Department of Energy
  6. Ultrafast Polysilylene Scintillators

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of Energy
  7. Develop Exercise Software to Run on ARPA JANUS-3D Warqame in UNIX Environment

    SBC: Advanced Systems Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1994 Department of DefenseDefense Advanced Research Projects Agency
  8. A RECUPERATOR FOR CRYOCOOLERS

    SBC: Almatech            Topic: N/A

    THIS PROJECT INVOLVES DEVELOPMENT AND VERIFICATION OF THE PERFORMANCE OF A NOVEL HEAT EXCHANGER OPERATING IN THE 98 TO 99 PERCENT THERMAL EFFECTIVENESS RANGE. HEAT EXCHANGERS FOR CRYOCOOLER APPLICATIONS USED IN HIGH ENERGY PHYSICS, REMOTE SENSING, ETC., FREQUENTLY REQUIRE THERMAL EFFECTIVENESS OF OVER 98%. THIS IS DIFFICULT TO ACCOMPLISH,PRIMARILY BECAUSE OF THE EFFECT OF THE LONGITUDINAL THERMAL ...

    SBIR Phase I 1988 Department of Energy
  9. STANDOFF MINE DETECTOR

    SBC: Amparo Corp.on            Topic: N/A

    A METHOD FOR DETECTING BURIED PLASTIC MINE IN PRESENTED WHICH EMPLOYS THE ACTIVATION OF NITROGEN BY 14 MEV NEUTRONS AND THE SUBSEQUENT DETECTION OF EMITTED 7 MEV GAMMA RAYS. THE DETECTION SYSTEM IS TRANSPORTED BY A REMOTELY PILOTED VEHICLE WHICH PROVIDES THE REQUIRED STANDOFF DISTANCES.

    SBIR Phase II 1988 Department of DefenseDefense Advanced Research Projects Agency
  10. A FIBER OPTIC ARRAY DETECTOR

    SBC: Amparo Corp.on            Topic: N/A

    WIRE CHAMBERS ARE A CLASS OF PARTICLE TRACK DETECTORS THAT HAVE FOUND WIDE APPLICATIONS IN HIGH ENERGY PARTICLE PHYSICS EXPERIMENTS. LARGE WIRE CHAMBER DETECTORS HAVE BECOME RATHER COMPLEX, REQUIRING MANY FAST ELECTRONIC CIRCUITS. THIS INVESTIGATION OFFERS THE POTENTIAL OF SIMPLIFICATION AND COST REDUCTION FOR LARGE WIRE CHAMBER DETECTORS. THE PHASE I EFFORT IS INVESTIGATING THE FEASIBILITY OF USI ...

    SBIR Phase I 1992 Department of Energy
US Flag An Official Website of the United States Government