You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
RECLAMATION OF SOILS AND SOIL LEACHATES CONTAMINATED WITH HEAVY METALS
SBC: Bio-recovery Systems, Inc Topic: N/ASOIL WASHING OR FLUSHING HAS BEEN SHOWN TO BE AN EFFECTIVE METHOD FOR REMOVING HEAVY METALS FROM METAL-CONTAMINATED SOILS AT SUPERFUND SITES. SANDY SOILS CAN OFTEN BE WASHED WITH WATER TO MOBILIZE METAL IONS IN AN AQUEOUS PHASE, BUT FOR CLAY SOILS OR SOILS WHICH CONTAIN INSOLUBLE METAL COMPOUNDS, E.G., LEAD SULFATE, OTHER ADDITIVES SUCH AS CHELATING AGENTS (EDTA) ARE USED TO EFFECT TRANSFER OF MET ...
SBIR Phase I 1990 Environmental Protection Agency -
ENHANCED SIMULATOR TRAINING PROGRAM FOR OPERATORS AT MULTI-UNIT PLANTS.
SBC: Corpe Corp. Topic: N/AAT MULTI-UNIT NUCLEAR GENRATING STATIONS, CONTROL ROOM OPERATORS ARE GENERALLY LICENSED TO OPERATE ALL SIMILAR UNITS. SIMULATOR TRAINING CONDUCTED AT THE LICENSEE TRAINING FACILITY OCCURS ON ONE SIMULATOR WHICH MAY NOT EXACTLY MIMIC ANY UNIT. INADEQUATE TRAINING ON UNIT-TO-UNIT AND UNIT-TO-SIMULATOR DIFFERENCES, IN CONJUNCTION WITH LIMITED PER-PERSON SIMULATOR TRAINING HOURS, CAN RESULT IN INCREAS ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
HIGH SENSITIVITY URANIUM BIOASSAY
SBC: Eastern Analytical Inc. Topic: N/ADETERMINATION OF URANIUM IN THE URINE OF WORKERS IS REQUIRED BY THE NRC AT NUCLEAR FACILITIES. EXTREMELY LOW CONCENTRATIONS OF URANIUM, ESPECIALLY IN SMALL SAMPLES, ARE DIFFICULT TO MEASURE USING EXISTING TECHNOLOGY. FUTURE NRC PLANS TO CHARACTERIZE BIOAVAILABLE URANIUM FRACTIONS COMPRISING THE URANIUM BODY BURDEN WILL REQUIRE EVEN HIGHER SENSITIVITIES. HIGH SENSITIVITY TECHNOLOGY DEVELOPED FOR UR ...
SBIR Phase I 1992 Nuclear Regulatory Commission -
Development of a Multianalyte Biosensor Instrument
SBC: Ergopedia, Inc. Topic: N/AThis Phase I project will develop a multianalyte biosensor field screening instrument (MBFI). The MBFI has the potential to reduce the annual cost of environmental analyses in the United States by more than $20 million and to reduce the analysis turnaround time from approximately 19 days to less than 15 minutes. The major barrier to the development of a biosensor instrument for environmental mea ...
SBIR Phase I 1997 Environmental Protection Agency -
ROBUST, ACCURATE, NON-CONTACTING VIBRATION MEASUREMENT SYSTEM
SBC: EPOCH ENGINEERING, INC. Topic: N/AWHEN ROTATING MACHINERY DETERIORATES, VIBRTION PATTERSN CHANGE. WHEN BEARING FREQUENCIES APPEAR, THEN INCREASE IN AMPLITUDE, BEARING FAILURE LOOMS. THE SAME WITH VALVES; WHEN THEY LEAK, THEY VIBRATE. AS LEAKAGE INCREASES, THE VIBRATION PATTERN CHANGES. THERE ARE MANY OTHERS. THE KEY IS KNOWING WHERE AND HOW DEEPLY TO LOOK. THE KEY IN OLDER REACTOR PLANTS IS TO UNOBTRUSIVELY, ECONOMICALLY BACKFIT S ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
DEVELOPMENT OF IMPROVED TECHNIQUES FOR DYNAMIC PRA
SBC: Frh, Inc. Topic: N/ACHANGES IN PLANT STATUS, EITHER BEFORE OR DURING AN ACCIDENT SEQUENC CAN CONSIDERABLY AFFECT ITS OUTCOME; BOTH THE ACTURAL OUTCOME AND THAT PREDICTED BY PROBABILISTIC RISK ASSESSMENT. IN ORDER TO ACCURATELY REPRESENT THE POSSIBLE ACCIDENTS AND THEIR PROBABILITIES, THE PRA MODEL MUST CONSIDER THE DYNAMIC CHARACTER OF THE PLANT, IT'S SYSTEMS AND OPERATORS. A LIVING, DYNAMIC PRA IS ONE IN WHICH ALL T ...
SBIR Phase I 1994 Nuclear Regulatory Commission -
MERCURY-FREE HIGH CRI EFFICIENT LAMP
SBC: Fusion Systems Corp. Topic: N/AN/A
SBIR Phase I 1992 Environmental Protection Agency -
A NOVEL APPROACH FOR ENHANCING IN-SITU BIOREMEDIATION OF TRICHLOROETHYLENE
SBC: Geo-microbial Technologies, In Topic: N/ATRICHLOROETHYLENE (TCE) IS A WIDESPREAD POLLUTANT AND IS REPORTED TO BE THE MOST FREQUENTLY ENCOUNTERED CONTAMINANT AT HAZARDOUS WASTE SITES. ALL PREVIOUS ATTEMPTS AT IN SITU BIOREMEDIATION HAVE USED A PROCESS WHERE METHANTROPHIC BACTERIA WERE STIMULATED BY THE SUBSURFACE DELIVERY OF AIR AND METHANE RESULTING IN A "FORTUITOUS" COMETABOLISM OF TCE. THIS PROCESS AT ONE TIME APPEARED PROMISING FOR TH ...
SBIR Phase I 1992 Environmental Protection Agency -
STEAM REFORMING OF MUNICIPAL WASTEWATER SLUDGE
SBC: Manufacturing And Technology Conversion Int'l, Inc Topic: N/ATHE MTIC INDIRECT STEAM REFORMING PROCESS OFFERS A COST EFFECTIVE ALTERNATIVE TO THE EXISTING WASTE-TO-ENERGY INCINERATION OF MUNICIPAL SLUDGE WASTE (MSW) OR REFUSE- DERIVED FUEL (RDF). THE PROCESS HAS THE POTENTIAL FOR RESOLVING MANY OF THE ENVIRONMENTAL ISSUES ASSOCIATED WITH INCINERATION, ESPECIALLY IN THE CONTROL OF CHLORINATED DIOXINS AND FURANS AS WELL AS EMISSIONS OF TOXIC METALS; PARTICULA ...
SBIR Phase I 1990 Environmental Protection Agency -
RETROFIT PULSATING AFTER BURNER FOR EMISSION CONTROL FROM RESIDENTIAL WOOD STOVES
SBC: Manufacturing And Technology Conversion Int'l, Inc Topic: N/ATHIS PROJECT IS FOCUSED UPON RESOLVING THE INCOMPLETE COMBUSTION PROBLEMS ENCOUNTERED IN RESIDENTIAL WOOD STOVES DUE TO LOW COMBUSTION TEMPERATURES, UNCONTROLLED AIR DRAFT RATES, VARIABILITY IN WOOD FUEL AND MOISTURE. A PROTOTYPE RETROFIT KIT IS TO BE FABRICATED AND TESTED TO DEMONSTRATE THE FEASIBILITY OF THE DEVICE AS AN INEXPENSIVE, EASILY INSTALLABLE AND OPERABLE EMISSIONS CONTROL DEVICE THAT ...
SBIR Phase I 1992 Environmental Protection Agency