You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Small Lot Repair/Manufacture of Microcircuit Boards by Laser Deposition

    SBC: Cm Consulting            Topic: N/A

    The final prototype of the Microcircuit Board Repair apparatus will be capable of laying down or lifting metal strips with micrometer dimensions. Under real time computer control, the translation stages will be fully automated or manually controlled. The end user will monitor the process in real time using a camera attached with the source. Laying down the metal lines will be done using Laser C ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  2. Porous Sol-Gel Derived Ceramic Release Agent

    SBC: TPL, INC            Topic: N/A

    Breathable release coatings that can withstand processing conditions up to 750F are needed for use on ceramic tooling. In situ removal of volatiles in solvent-based composite processing is a critical issue that will enable production of high quality parts at lower cost per part. Current release coatings meet neither the temperature nor the solvent transport requirements of solvent-based composit ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  3. Displays for Avoiding Motion Sickness

    SBC: Virtual I-o            Topic: N/A

    Viewing the horizon is helpful in reducing the symptoms of motion sickness in ship board personnel. Many of a ship's complement are required to constantly monitor visual displays that are fixed to the deck and provide no view of the horizon. Virtual i-O! proposes a research study where horizon information is provided in combination with a visual display mounted on the head. This information ...

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  4. MEASUREMENT OF RESIDUAL RADIOACTIVE CONTAMINATION BY 2-D LASER HEATED TLD

    SBC: International Sensor            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  5. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  6. A PORTABLE IMAGING SYSTEM FOR NONDESTRUCTIVE EXAMINATION OF NUCLEAR POWER PLANT COMPONENTS

    SBC: TPL, INC            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  7. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  8. BUNDLES UNDER LOW REFLOOD RATES AND BOIL OFF CONDITIONS

    SBC: Mohr And Associates            Topic: N/A

    THIS PROGRAM DEALS WITH USING THE DIGITIZED VIDEO TDR LIQUIDLEVEL DATA PREPARED UNDER CONTRACT (NRC-04-84-146) OF THE MEMT-4 TEST FROM THE LOCA SIMULATION IN NRU PROGRAM. THESE NEW DATA AND TECHNIQUES WILL BE APPLIED TO ESTIMATE THE VOIDFRACTION, LIQUID LEVEL, AND LOCAL HEAT TRANFER CONDITIONS FOR THE OTHER NRU TESTS WHERE ONLY SELF POWERED NEUTRON DETECTORS (SPND'S) AND THERMOCOUPLE DATA ARE AVAI ...

    SBIR Phase I 1985 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government