You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
-
Ultrafast Polysilylene Scintillators
SBC: Adherent Technologies, Inc. Topic: N/A40640 November 12, 1996 Adherent Technologies, Inc. Scintillators have been used for over 90 years to detect ionizing radiation, but solid organic scintillator, commonly used in physics experimentation, suffer from errors caused by pulse pileup. To minimize this problem, this project will examine a new class of polymeric materials which also offer the po ...
SBIR Phase II 1997 Department of Energy -
Template-Medicated Synthesis of Periodic Membranes for Improved Liquid-Phase Separations
SBC: American Research Corporation of Virginia Topic: N/A40417 November 18, 1996 American Research Corporation of Virginia This project addresses the hazardous waste problem at Department of Energy sites by developing a new class of ultrafiltration membranes for use in corrosive aqueous or organic streams. These membranes will utilize mesoporous ceramics, which have narrow pore size distributions and tailorabl ...
SBIR Phase II 1997 Department of Energy -
High Power Target Design for a Next Generation Radioactive Beam ISOL-Type Facility
SBC: Amparo Corp.on Topic: N/A40063 November 4, 1996 Amparo Corporation First-generation radioactive beam facilities, in use or under construction, cannot completely address many of the scientific opportunities envisioned until an intense production beam is employed. This project addresses a key element in filling this need, the design of high power nuclear targets. The targe ...
SBIR Phase II 1997 Department of Energy -
Development of an Inexpensive Mini-Optical Light Shelf (MOLS) Daylighting System
SBC: Architectural Energy Corporati Topic: N/A80 Development of an Inexpensive Mini-Optical Light Shelf (MOLS) Daylighting System--Architectural Energy Corporation, 2540 Frontier Avenue, Suite 201, Boulder, CO 80301-2400; (303) 444-4149 Mr. Neall Digert, MIES, Principal Investigator Mr. Michael Holtz, AIA, Business Official DOE Grant No. DE-FG03-97ER82331 Amount: $74,902 Approximately $71 billion is spent annually on the power needs of no ...
SBIR Phase I 1997 Department of Energy -
A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles
SBC: Commercial Electronics, Inc. Topic: N/A86 A Low Cost Acoustic Property Sensor for Measuring Natural Gas Composition in Liquid Natural Gas (LNG) Powered Vehicles--Commercial Electronics, Inc., 801 North 15th Street, Broken Arrow, OK 74012-2838; (918) 251-0925 Mr. Scott Phillips, Principal Investigator Mr. Michael A. Phillips, Business Official DOE Grant No. DE-FG03-97ER82353 Amount: $75,000 Among the various alternative fuels propos ...
SBIR Phase I 1997 Department of Energy -
LNG Storage and Delivery System Analysis
SBC: Directed Technologies, Inc. Topic: N/A87 LNG Storage and Delivery System Analysis--Directed Technologies, Inc., 4001 North Fairfax Drive, Suite 775, Arlington, VA 22203-1614; (703) 243-3383 Mr. Brian D. James, Principal Investigator Mr. Ira F. Kuhn, Jr., Business Official DOE Grant No. DE-FG02-97ER82357 Amount: $75,000 To reduce foreign fuel dependence and improve the Nation¿s air quality, new high-efficiency, direct-injection d ...
SBIR Phase I 1997 Department of Energy -
Portable Personal Monitors for Toxic Metal Aerosols
SBC: ENVIRONMENTAL & LIFE SUPPORT TECHNOLOGY Topic: N/A28 Portable Personal Monitors for Toxic Metal Aerosols--Environmental and Life Support Technologies, Inc., 12838 W. Adriatic Avenue, Lakewood, CO 80228-4301; (303) 987-1322 Mr. Clifford D. Jolly, Principal Investigator Mr. Clifford D. Jolly, Business Official DOE Grant No. DE-FG03-97ER82369 Amount: $74,961 Risk of occupational exposure to toxic airborne metals and dusts exists due to the lack ...
SBIR Phase I 1997 Department of Energy -
Low Viscosity Organic Insulation Systems For Improved Processing and Reduced Radiation Induced Gas Evolution
SBC: ELTRON RESEARCH & DEVELOPMENT, INCORPORATED Topic: N/A191 Low Viscosity Organic Insulation Systems For Improved Processing and Reduced Radiation Induced Gas Evolution--Eltron Research, Inc., 5660 Airport Boulevard, Boulder, CO 80301-2340; 303-440-8008 Dr. James B. Schutz, Principal Investigator Ms. Eileen E. Sammells, Business Official DOE Grant No. DE-FG03-97ER82366 Amount: $74,994 Advanced magnetic fusion energy experiments will require large ...
SBIR Phase I 1997 Department of Energy -
Miniaturized Flow Cell for Electrochemical Detection of Heavy Metals
SBC: ELTRON RESEARCH & DEVELOPMENT, INCORPORATED Topic: N/A3 Miniaturized Flow Cell for Electrochemical Detection of Heavy Metals--Eltron Research, Inc., 5660 Airport Boulevard, Boulder, CO 80301-2340; (303) 440-8008 Dr. Michael T. Carter, Principal Investigator Mrs. Eileen E. Sammells, Business Official DOE Grant No. DE-FG03-97ER82365 Amount: $74,996 Department of Energy facilities contain a number of sites where ground water heavy metal contaminati ...
SBIR Phase I 1997 Department of Energy -
Three Dimensional Cathode for the Electrolytic Removal of Heavy Metals from Aqueous Waste Streams
SBC: ELTRON RESEARCH & DEVELOPMENT, INCORPORATED Topic: N/A9 45847-97-I Three Dimensional Cathode for the Electrolytic Removal of Heavy Metals from Aqueous Waste Streams--Eltron Research, Inc., 5660 Airport Boulevard, Boulder, CO 80301-2340; (303) 440-8008 Ms. Ella F. Spiegel, Principal Investigator Ms. Eileen E. Sammells, Business Official DOE Grant No. DE-FG03-97ER82363 Amount: $74,978 Water contaminated by heavy metals arises from decontamination ...
SBIR Phase I 1997 Department of Energy