You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY21 is not expected to be complete until September, 2022.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. N/A

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseOffice of the Secretary of Defense
  2. Design, Manufacture, and Test of an Underwater Acoustic Intensity Probe

    SBC: Acoustech Corporation            Topic: N/A

    The Acoustech Corporation as the prime contractor and the Pennsylvania State University - Applied Research Labc-atory as the subcontractor propose to design, manufacture, and test an underwater acoustic intensity probe containing a geophone and two-hydrophones encased in a neutrally buoyant package. The results of this proposed effort are anticipated to be highly successful since the researc ...

    SBIR Phase II 1998 Department of DefenseOffice of the Secretary of Defense
  3. N/A

    SBC: AGENTASE LLC            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseOffice of the Secretary of Defense
  4. Analysis and Improvement of Trivalent Chromium Conversion Coatings for Aluminum Alloys

    SBC: American Research Corporation of Virginia            Topic: N/A

    The trend toward replacement of highly toxic chemicals with less hazardous alternatives has created the demand for replacement of chromate conversion coatings for corrosion protection of aluminum alloys. Aluminum alloys are the predominate structural material used in aircraft because of their high strength-to-weight ratios, affordability and processability. Aluminum is subject to catastrophic fail ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  5. Computer Enhanced Eddy Current Detection of Hidden Substructure Edges and Holes

    SBC: American Research Corporation of Virginia            Topic: N/A

    N/A

    SBIR Phase II 1998 Department of DefenseOffice of the Secretary of Defense
  6. N/A

    SBC: AZIMUTH, INC            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseOffice of the Secretary of Defense
  7. Advanced Nickel-Metal Hydride Battery

    SBC: Mobile Energy Products, Inc.            Topic: N/A

    Many DOD systems employ rechargeable batteries to supply power. Battery weight, volume, cycle life and cost are generally limited considerations in enabling satisfactory mission performance. Systems presently utilize Lead-Acid, Nickel-Cadmium, Nickel-Metal Hydride or Lithium-Iobatteries. The Nickel-Metal Hydride (Ni-MN) system is now under study as a superior candidate for many applications. El ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  8. SMART SENSORS USING OPTICAL FIBER INTERCONNECTS AND DISTRIBUTED MEMS

    SBC: Luna Innovations Incorporated            Topic: N/A

    This SBIR program would develop practical methods for the interconnection, addressing and control of large numbers of distributed MEMS-based sensing and actuation elements using optical fiber multiplexing techniques. Such interconnected sensor/actuator arrays have immediate and long-term applications in the instrumentation and control of adaptive aircraft, spacecraft and hydrocraft structures, fl ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  9. Optical Fiber-Based Corrosion System Using Electrochemically Active Coatings

    SBC: Luna Innovations Incorporated            Topic: N/A

    The objective of the proposed program is to address the high service costs of the current U.S. Navy fleet of aircraft by developing a distributed optical fiber sensor system that will help reduce the costs associated with corrosion damage and extend the lifetime of existing aircraft. Annual corrosion of Navy metallic structures has been estimated as high as $1 billion. Additional costs aris ...

    SBIR Phase II 1998 Department of DefenseOffice of the Secretary of Defense
  10. N/A

    SBC: Jeneric/pentron, Inc.            Topic: N/A

    N/A

    SBIR Phase II 1999 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government