You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ABDUCTIVE/EXPERT SYSTEM CONTROLLER

    SBC: ABTECH CORPORATION            Topic: N/A

    THE OBJECTIVE OF THIS EFFORT IS TO DEMONSTRATE A PROTOTYPE CONTROLLER FOR A HOWITZER USING A HYBRID NETWORK AND PRODUCTION RULE SYSTEM. THE RESULTING ADAPTIVE CONTROLLER WILL DEMONSTRATE THE FEASIBILITY OF DEVELOPING A REVOLUTIONARY CONTROLLER CAPABLE OF ADAPTING IN A DYNAMIC ENVIRONMENT, MONITORING AND DIAGNOSING BEHAVIOR, AND PREDICTING FUTURE FAULTS AND MAINTENANCE REQUIREMENTS. ABTECH HAS DEVE ...

    SBIR Phase II 1994 Department of DefenseArmy
  2. A Beginning Sign Language VideoCourse for Hearing Adult Learners

    SBC: The Masters Group            Topic: N/A

    This Phase I project will consist of a fesibility study in preparation for Phase II project in which a complete 20-hour sign language videocourse will be produced reflecting the entry level skills, learning styles, learning preferences, and sign-processing strategies of hearing adult beginning learners. The primary hearing populations for this instruction are (a) current and prospective teachers ...

    SBIR Phase II 1997 Department of Education
  3. A Blink-based Communication (BLINC) System for Patients in Bed

    SBC: BARRON ASSOCIATES, INC.            Topic: 600

    DESCRIPTION provided by applicant Introduction The Blink based Communication BLINC System will allow any patient who retains oculomotor control to reliably signal for assistance and communicate basic requests to a caregiver It uses infrared IR cameras and illuminators to continuously monitor a patient in bed and to detect blink signals even in a dark room It is specifically designed so ...

    SBIR Phase II 2014 Department of Health and Human ServicesNational Institutes of Health
  4. Accelerating Cavities for a Relativistic Klystron Two-Beam Accelerator

    SBC: Fm Technologies Inc            Topic: N/A

    41299 November 19, 1996 FM Technologies, Inc. In the Relativistic Klystron Two-Beam Accelerator, which is currently under development, power from a low-energy, high-current, bunched beam is converted to micro-waves via the klystron mechanism and used to provide power for a high-energy linac, specifically a future Next Linear Collider upgrade to l.0 TeV. ...

    SBIR Phase II 1997 Department of Energy
  5. ACCURATE PASSIVE RANGING TECHIQUES

    SBC: ASTRON WIRELESS TECHNOLIGIES, INC.            Topic: N/A

    Monopole and dipole antennas have been determined to radiate most efficiently when the size of the antenna is proportional to the frequency being transitted or received, ie.e, one-quarter, one-half or one wavelength. As the operating frequency is varied from that ideal frequency, nulls begin to develolp which threaten the integrity of the communication link. Experience has shown that small excusio ...

    SBIR Phase II 1994 Department of DefenseNavy
  6. A Combined Micro-Mechanics, Fracture Mechanics, And Statistical Approach For Life Prediction Of Ceramic Matrix And Metal Matrix Composites

    SBC: Tao Of Systems Integration Inc            Topic: N/A

    N/A

    SBIR Phase II 1996 National Aeronautics and Space Administration
  7. A Comet Surface Sample Return System

    SBC: Honeybee Robotics, Ltd.            Topic: S107

    The proposed Phase II investigation will focus on the development of spacecraft systems required to obtain a sample from the nucleus of a comet, hermetically seal the sample within a capsule, and return the sealed sample to an orbiting spacecraft which can return the sample to Earth. A systems level concept for the Comet Surface Sample Return Probe has been developed in Phase I. This concept will ...

    SBIR Phase II 2014 National Aeronautics and Space Administration
  8. A COMPREHENSIVE PROGRAM TO DESIGN HIGH PERFORMANCE AND HIGH EFFICIENCY AGRICULTURAL VENTILATION SYSTEMS

    SBC: Digital Flow Technologies, Inc            Topic: N/A

    Not Available Tunnel ventilation is an effective means of protecting and enhancing the productivity of livestock (especially swine and egg layers) in large scale confinement barns. The capital and operating costs for these fan installations typically represents a significant fraction of the total costs to the livestock producer. The Phase I research program has shown that significant improvements ...

    SBIR Phase II 1999 Department of Agriculture
  9. A Cost-Effective System for Hydraulic Conductivity Measurement and

    SBC: Monitoring Technology Corp            Topic: N/A

    N/A

    SBIR Phase II 1996 Department of DefenseAir Force
  10. ACOUSTIC ARRAY TECHNIQUE FOR WIND TUNNEL APPLICATIONS

    SBC: PLANNING SYSTEMS, INC.            Topic: N/A

    THIS IS A PROPOSAL TO PRODUCE AN ACOUSTIC ARRAY DESIGN SUITABLE FOR MAKING ACOUSTIC MEASUREMENTS OF MODEL HELICOPTERS IN A WIND TUNNEL. THIS "FEASIBILITY DESIGN" WILL DEMONSTRATE THE THEORETICAL FEASIBILITY OF SUCH A WIND TUNNEL ARRAY, AND WILL QUANTIFY THE PERFORMANCE OF SUCH AN ARRAY. THE WORK WILL INVESTIGATE THE DESIGN TRADEOFFS AVAILABLE AND WILL ESTABLISH THE COMPUTATIONAL REQUIREMENTS FOR A ...

    SBIR Phase II 1994 Department of DefenseArmy
US Flag An Official Website of the United States Government