You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  2. IMPROVEMENTS IN MOTOR OPERATED GATE VALVE DESIGN AND PREDICTIVE MODELS FOR RELIABILITY IMPROVEMENTS IN NUCLEAR POWER PLANT SAFETY SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    MOTOR OPERATED GATE VALVE OPERABILITY PROBLEMS AND FAILURES AT NUCLEAR POWER PLANTS ARE A MAJOR SAFETY CONCERN AS STATEDIN NRC IE BULLETIN 85-03 AND GENERIC LETTER 89-10. THIS PROPOSAL IS AIMED AT IMPROVING GATE VALVE PERFORMANCE BY (1) DEVELOPING COMPREHENSIVE PERFORMANCE PREDICTION MODELS FOR USE OVER A RANGE OF OPERATING CONDITIONS, (2) DEFINING LIMITS, BASED ON SPECIFIC DESIGNS, BEYOND WHICH E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  3. SCILNTILLATION FIBER DETECTOR FOR IN-VIVO ENDOSCOPIC INTER- NAL DOSIMETRY

    SBC: Center For Planning & Research            Topic: N/A

    AN ALPHA/BETA RADIATION DETECTOR SUITABLE FOR USE IN THE INSTRUMENT CHANNEL OF A FIBEROPTIC ENDOSCOPE WILL BE WILL BE DEVELOPED TO PROVIDE IN-VIVO IN-SITU BIOASSAY MEASUREMENTS LEADING TO COMPUTER-ASSISTED ESTIMATES OF IN- TERNAL DOSE AND DISTRIBUTION IN THE RESPIRATORY AND GASTRO- INTESTINAL TRACTS. DURING PHASE I OF THE PROGRAM, ALPHA AND BETA PARTICLE SENSITIVE SCINTILLATING PLASTIC FIBERS WILL ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  4. A FUZZY SET APPROACH FOR SEISMIC SAFETY MARGINS ASSESSMENT.

    SBC: Eda Consultants            Topic: N/A

    THE CONTRACTOR SHALL DEVELOP A FUZZY SET METHODOLOGY FOR UNCERTAINTY ANALYSIS IN PROBABILISTIC SEISMIC SAFETY ASSESSMENT OF NUCLEAR POWER PLANTS. FUZZY SET LOGIC WILL BEUSED FOR COLLECTING, QUANTIFYING AND PROPAGATING SUBJECTIVE,ENGINEERING JUDGEMENT USED IN THE UNCERTAINTY ANALYSIS. IN PHASE I, FEASIBILITY OF THE PROPOSED APPROACH WILL BE DEMONSTRATED BY APPLYING IT TO SELECTED PARTS OF A PROBABI ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. AUTOMATIC CREATION AND RENODALIZATION OF TRAC-BWR INPUT DECKS

    SBC: Expert-ease Systems            Topic: N/A

    THE OBJECTIVE OF THE PROPOSED RESEARCH IS TO BUILD A USER-FRIENDLY, PERSONAL COMPUTER BASED WORKSTATION FOR PERFORMING TRAC-BWR ANALYSIS. THE SOFTWARE WILL ALLOW A USER TO READ-IN DATA FROM EXISTING TRAC-BWR INPUT DECKS (ASCII), DRAW NODALIZATION DIAGRAM, MODIFY INPUT, AUTOMATICALLY RENODALIZE THE VESSEL, CHAN AND PIPE COMPONENTS, GENERATE INPUT DECK, SUBMIT JOB, BRING BACK PLOTDATA, DISPLAY RESUL ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  6. "SEVERE ACCIDENT PHENOMENA: NATURAL CIRCULATION IN REACTOR COOLANT SYSTEM"

    SBC: Fluid Physics Ind.            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED FOR THE DEVELOPMENT OF A VALIDATED METHODOLOGY FOR PREDICTING THE EX-VESSEL BUOYANCY-DRIVEN FLOWS IN THE HOT LEG AND STEAM GENERATOR OF A WESTINGHOUSE PLANT, AND IN THE CANDY CANE HOT LEG OF A B&W PLANT. THE PROPOSED PHASE I WORK PLAN CONSISTS OF (A) REVIEWING AVAILABLE WESTINGHOUSE EXPERIMENTAL DATA AND SIMULATING THE EXPERIMENTAL CONFIGURATION, (B) VALIDATING THE M ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  7. AGING PROCESSES IN NUCLEAR REACTORS

    SBC: Pdi Technology Inc            Topic: N/A

    AS NUCLEAR PLANTS GROW OLDER, ENVIRONMENTAL CONDITIONS MAY AFFECT THE PERFORMANCE OF PLANT CONCRETE AND STEEL STRUCTURES. WE PROPOSE TO DEVELOP A STRATEGY WHICH CAN BE APPLIED TO CONCRETE STRUCTURES. IT WILL BE DIRECTED TOWARDSTHE DEVELOPMENT OF METHODS TO ANALYZE AND UNDERSTAND AGING EFFECTS, INCLUDING THE COMBINED EFFECTS OF TIME, TEMPERATURE, RADIATION, HUMIDITY, STRESS, CHEMICAL ENVIRONMENT AN ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
  8. PREDICTION OF CHECK VALVE PERFORMANCE & DEGRADATION IN NUCLEAR POWER PLANT SYSTEMS

    SBC: KALSI ENGINEERING, INC            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government