You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Feasibility of Using Impulse Radar to Detect and Identify Detonators

    SBC: AKELA INC            Topic: N/A

    This proposal seeks to demonstrate the feasibility of using impulse radar techniques to detect and identify explosive detonators. It relies on the fact that a radar impulse will excite natural electromagnetic resonances which characterize the size, shape, and material composition of an object. These resonances are present in the scattered transient return from the object and can be extracted by ...

    SBIR Phase I 1996 Department of Transportation
  2. REMOTE AERIAL INSPECTION OF BRIDGES

    SBC: Aca Industries, Inc.            Topic: N/A

    OF THE OVER 600,000 HIGHWAY BRIDGES AND APPROXIMATELY 100,000 RAILROAD BRIDGES IN THE U.S., MANY ARE DIFFICULT TO INSPECT BECAUSE OF LIMITED ACCESSIBILITY. REMOTE INSPECTIONBY UNMANNED AERIAL VEHICLES MAY PROVIDE A SOLUTION TO THIS PROBLEM, BUT INVOLVES CONSIDERATIONS OF VEHICLE SUITABILITY (HELICOPTER, BLIMP DUCTED FAN VEHICLE), THE BRIDGE LOCAL ATMOSPHERIC ENVIRONMENT, AND THE TYPE OF CONTROL (R ...

    SBIR Phase I 1990 Department of Transportation
  3. DEVELOPMENT OF LOW POWER DIGITAL COMMUNICATION (LPDC) SYSTEM

    SBC: Amerasia Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  4. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  5. SHADOWGRAPH ENHANCEMENT

    SBC: Astrophysics Research Corp            Topic: N/A

    A METHOD OF AUTOMATED OPERATOR ASSISTANCE FOR SECURITY X_RAYMACHINE OPERATORS IS DEVELOPED AND EVALUATED. THE METHOD ISBASED ON ANALYSIS OF IMAGE AREAS SUFFICIENTLY DENSE TO POS- SIBLY CONTAIN A THREAT. BOTH METALLIC THREATS SUCH AS GUNS AND NONMETALLIC THREATS SUCH AS EXPLOSIVES ARE STUDIED.

    SBIR Phase I 1988 Department of Transportation
  6. IMPROVED DGPS DATA RELIABILITY THROUGH THE USE OF ADVANCED SIGNAL PROCESSING TECHNIQUES

    SBC: CAMBRIDGE ENGINEERING, Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of Transportation
  7. ROAD TESTS AND EVALUATION TO DETERMINE EFFECTIVENESS OF TRAFFIC ACCIDENT PREVENTION SONIC DEVICE TO IMPROVE SAFETY OF MOTOCYCLISTS AND SCHOOL BUS OCCUPANTS

    SBC: Computer Sonics Inc            Topic: N/A

    IN 1985, 4570 MOTRCYCLISTS AND 24 SCHOOL BUS OCCUPANTS WERE KILLED IN TRAFFIC ACCIDENTS. THE TOTAL SOCIETAL COST OF VEHICLE ACCIDENTS IN THE UNITED STATES IS ABOUT 30 BILLION DOLLARS PER YEAR. REDUCING THE VEHICLE TRAFFIC ACCIDENTS BY10% WILL RESULT IN THE NATIONAL WEALTH BY 3 BILLION DOLLARS THE OBJECTIVE OF THIS PROJECT IS TO DETERMINE EFFECTIVENESS OF RECENTLY DEVELOPED AND BUITL PROTOTYPES OF ...

    SBIR Phase I 1988 Department of Transportation
  8. CLIPBOARD COMPUTER ACCIDENT DATA COLLECTION AND TRANSMISSION

    SBC: GCAS, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Department of Transportation
  9. EVAL OF RELIABILITY & USEFULNESS OF EXTERNAL-INITIATOR PRA METHODOLOGIES

    SBC: Future Resources Associate Inc            Topic: N/A

    THE DISCIPLINE OF EXTERNAL-INITIATOR PRA ANALYSIS IS RELA- TIVELY LESS MATURE AND LESS RELIABLE THAN THE CORRESPONDING INTERNAL-INITIATORS PRA ANALYSIS. THESE RELATIVE WEAKNESSESHAVE MADE MANY DECISION-MAKERS, IN BOTH INDUSTRY AND THE NRCRELUCTANT TO USE EXTERNAL-INITIATOR PRA RESULTS. THE EXTER-NAL-INITIATOR ANALYSES HAVE BEEN CONSIDERED TOO UNCERTAIN, OR TOO CONSERVATIVE, OR SUPPORTED BY TOO LIT ...

    SBIR Phase I 1988 Nuclear Regulatory Commission
  10. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government