You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Manufacturing Methods for Sulfur Concrete Sewer Pipe

    SBC: Brimstone Pipe Company            Topic: N/A

    This Phase I research is intended to evaluate the feasibility of manufacturing low-cost, acid-resistant sanitary sewer pipe from sulfur concrete. Sulfur is an abundant mineral recovered from coking, natural gas processing, and petroleum refining. Secondary recovery of sulfur, resulting from environmental regulation, produces more material than is needed by U.S. industry. The U.S. Bureau of Mines ...

    SBIR Phase I 1997 Environmental Protection Agency
  2. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  3. RECLAMATION OF SOILS AND SOIL LEACHATES CONTAMINATED WITH HEAVY METALS

    SBC: Bio-recovery Systems, Inc            Topic: N/A

    SOIL WASHING OR FLUSHING HAS BEEN SHOWN TO BE AN EFFECTIVE METHOD FOR REMOVING HEAVY METALS FROM METAL-CONTAMINATED SOILS AT SUPERFUND SITES. SANDY SOILS CAN OFTEN BE WASHED WITH WATER TO MOBILIZE METAL IONS IN AN AQUEOUS PHASE, BUT FOR CLAY SOILS OR SOILS WHICH CONTAIN INSOLUBLE METAL COMPOUNDS, E.G., LEAD SULFATE, OTHER ADDITIVES SUCH AS CHELATING AGENTS (EDTA) ARE USED TO EFFECT TRANSFER OF MET ...

    SBIR Phase I 1990 Environmental Protection Agency
  4. Low Cost, Environmentally Benign Non-Chromate Conversion Coating

    SBC: Chemat Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Environmental Protection Agency
  5. Sol-Gel Derived Composite Coating as a Surface Pretreatment of Aluminium Alloy Adhesive Bonding

    SBC: Chemat Technology, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Environmental Protection Agency
  6. A Simplified Biosensor for Pesticide Residue Analysis

    SBC: DISAN, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 Environmental Protection Agency
  7. High Efficiency and Low Cost NOx Control via Promoted N-Agent Injection

    SBC: EERGC CORP.            Topic: N/A

    Prospective technologies for stationary post-combustion NOx control include: Selective Non-Catalytic Reduction (SNCR) and Selective Catalytic Reduction (SCR). These processes reduce NOx by non-catalytic or catalytic reactions with N-Agents (ammonia or urea). There are several problems with SCR, such as high capital cost, limited catalyst life, catalyst poisoning, and disposal. SNCR is less expe ...

    SBIR Phase I 1997 Environmental Protection Agency
  8. STABILIZATION OF ORGANIC POLLUTANTS

    SBC: Environmental Protection            Topic: N/A

    MENT, WHICH IS THE STABILIZATION OF SLUDGES HOLDING ORGANIC POLLUTANTS. SUCH SLUDGES REQUIRE STABILIZATION FOR COMPLI- ANCE TO REGULATORY GUIDELINES FOR FINAL DISPOSAL IN A SECURELANDFILL. FOR THIS PURPOSE, PRESENT TECHNOLOGY IS NOT SUIT-ABLE BECAUSE HYDRAULIC FIXATIVES COMMONLY EMPLOYED FOR TOXICWASTES STABILIZATION ARE INCOMPATIBLE WITH ORGANIC POLLUTANTS. IT IS PREFERABLE TO ELIMINATE SLUDGES H ...

    SBIR Phase I 1988 Environmental Protection Agency
  9. EVAL OF RELIABILITY & USEFULNESS OF EXTERNAL-INITIATOR PRA METHODOLOGIES

    SBC: Future Resources Associate Inc            Topic: N/A

    THE DISCIPLINE OF EXTERNAL-INITIATOR PRA ANALYSIS IS RELA- TIVELY LESS MATURE AND LESS RELIABLE THAN THE CORRESPONDING INTERNAL-INITIATORS PRA ANALYSIS. THESE RELATIVE WEAKNESSESHAVE MADE MANY DECISION-MAKERS, IN BOTH INDUSTRY AND THE NRCRELUCTANT TO USE EXTERNAL-INITIATOR PRA RESULTS. THE EXTER-NAL-INITIATOR ANALYSES HAVE BEEN CONSIDERED TOO UNCERTAIN, OR TOO CONSERVATIVE, OR SUPPORTED BY TOO LIT ...

    SBIR Phase I 1988 Nuclear Regulatory Commission
  10. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government