You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Development or Adaptation of Assistive Devices, Mechanisms, Technologies, or Techniques for Individuals with Disabilities

    SBC: Adaptive Computer Systems,            Topic: N/A

    Advancements in digital signal processing (DSP) and video technology have created an opportunity to develop a low-cost system to allow people with disabilities to control a computer using head and eye movements. A software-based system would be developed to track head and eye movements at much lower cost than the hardware-based systems currently available. The processing power available on the c ...

    SBIR Phase I 1996 Department of Education
  2. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  3. Effective Math Instruction for Adult Learners on CD-ROM

    SBC: CompuTaught, Inc.            Topic: N/A

    The goal of this project is to improve remedial math instruction for adults by combining (a) an effective adult education model; (b) an effective instructional design method, with; (c) the multimedia capabilities of the computer. The innovative combination of these components will produce an effective math program designed specifically for adult learners that can be used at home, at school, or ...

    SBIR Phase I 1997 Department of Education
  4. RESTORATION OF THE COMPETITIVE CAPABILITY AND PROFITABILITY OF RANDOLPH SHEPPARD VENDOR BUSINESSES BY INTRODUCING INNO-VATIVE EQUIPMENT TECHNOLOGIES AND NEW FOODSERVICE MARKETING PROGRAMS AND PRODUCT CONCEPTS.

    SBC: General Research And Analysis            Topic: N/A

    FOR 50 YEARS THE RANDOLPH-SHEPPARD VENDING PROGRAM HAS MEANTEMPLOYMENT AND INDEPENDENCE TO THE BLIND. TODAY, HOWEVER, THE PROGRAMS AND ITS VENDOR MEMBERS FACE SEVERE CHANGES IN THE BUSINESS ENVIRONMENT THAT THREATEN THE LONG TERM ECO-NOMIC STABILITY OF MANY INDIVIDUAL OPERATORS AND PERHAPS THEENTIRE PROGRAM. THIS NEW BUSINESS ENVIRONMENT FEATURES IN- TENSIFIED COMPETITION FROM THE PRIVATE SECTOR, ...

    SBIR Phase I 1988 Department of Education
  5. DEV OF A LARGE CROSS SECTIONAL AREA SELF-POWERED DETECTOR

    SBC: K E M P CORP            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  6. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  7. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  8. IMPROVED NEUTRON SPECTROMETER AND EXPOSURE METER

    SBC: Shonka Research Associates            Topic: N/A

    THE UNCERTAINTY IN MEASURING NEUTRON DOSE EQUIVALENT RATES RESULTS IN UNCERTAINTY IN ASSIGNMENT OF THE PROPER DOSE TO OCCUPATIONAL RECORDS AND CAN RESULT IN IMPROPER IMPLEMENTATION OF CONTROLS TO LIMIT THE EXPOSURE. A NOVEL PORTABLE NEUTRON SPECTROMETER IS PROPOSED WHICH WILL REDUCE THE UNCERTAINTY OF SUCH MEASUREMENTS TO LESS THAN 20%. MANYCOMPONENTS OF THIS DEVICE ARE COMMERCIALLY AVAILABLE. SYS ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government