You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. NEUROCONTROL FOR AN AIR BREATHING ROCKET PROPULSION SYSTEMS

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  2. Adaptive Control Of Air Turbo Ramjet

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  3. ADVANCED TELEROBOTICS CONCEPTS USING NEURAL NETWORKS

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1990 National Aeronautics and Space Administration
  4. Subscale X-33 Rpv And Autolander

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  5. High Performance Parallel Real-Time Analysis System

    SBC: Active Parallel Instrumentation, Inc            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  6. COST REDUCTION DESIGNS OF A LARGE RANGE OF HIGH PERFORMANCE PM ALTERNATORS AND CONTROLS WITH A PARALLEL EMPHASIS ON...

    SBC: Active Technologies Inc.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  7. HIGH-TEMPERATURE FINISH FOR AMB-21 MATRIX COMPOSITES

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  8. Novel Adhesives For Space Applications

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  9. DEVELOPMENT OF A NEW SOLUTION METHOD FOR ROBOT KINEMATIC EQUATIONS

    SBC: Advanced Control Technologies            Topic: N/A

    A NEW TECHNIQUE FOR SOLVING ROBOT KINEMATIC EQUATIONS WILL BE DEVELOPED WHICH WILL RESULT IN A CLOSED FORM EXPRESSION FOR THE JOINT COORDINATES AS FUNCTIONS OF END EFFECTOR POSITION AND ORIENTATION. THE TECHNIQUE IS NEITHER INTERATIVE NOR ANALYTIC. THE JOINT COORDINATES WILL BE MODELED AS NONLINEAR FUNCTIONS OF THE DESIRED POSITION AND ORIENTATION OF THE END EFFECTOR IN OBJECT SPACE. GIVEN ONLYEMP ...

    SBIR Phase I 1988 National Aeronautics and Space Administration
  10. EFFECT OF AGING ON RESPONSE TIME OF NUCLEAR PLANT PRESSURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government