You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. N/A

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 National Aeronautics and Space Administration
  2. N/A

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 National Aeronautics and Space Administration
  3. HIGH-TEMPERATURE FINISH FOR AMB-21 MATRIX COMPOSITES

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1996 National Aeronautics and Space Administration
  4. Novel Adhesives For Space Applications

    SBC: Adherent Technologies, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1997 National Aeronautics and Space Administration
  5. A FREQUENCY-TUNABLE 3 OCTAVE RADAR FOR VEHICLE EXHAUST PLUMEAND TOXIC SUBSTANCES MONITOR

    SBC: Aeromet, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 National Aeronautics and Space Administration
  6. NETWORK PROGRAMMING LANGUAGE NETWORK PROGRAMMING LANGUAGE

    SBC: Apeiron            Topic: N/A

    THE PROPOSED INNOVATION CONSISTS OF A PROGRAMMING ENVIRONMENT WHERE EXECUTION TAKES PLACE THROUGHOUT A (PERHAPS HETEROGENEOUS) NETWORK OF COMPUTING DEVICES. FROM THE PROGRAMMER'S POINT OF VIEW, THE LANGUAGE APPEARS AS AN ICONIC OBJECT FLOW LANGUAGE (SUCH AS PROGRAPH) WITH A FEW EXTENSIONS FOR ATTACHING SALIENCE TO SELECTED PROCESSES. NOKNOWLEDGE OF THE NETWORK ARCHITECTURE OR PROTOCOL IS REQUIRED ...

    SBIR Phase I 1992 National Aeronautics and Space Administration
  7. WIRELESS HEADSET

    SBC: Apeiron            Topic: N/A

    N/A

    SBIR Phase I 1988 National Aeronautics and Space Administration
  8. N/A

    SBC: APPLIED NANOTECH, INC.            Topic: N/A

    N/A

    SBIR Phase I 2000 National Aeronautics and Space Administration
  9. N/A

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 National Aeronautics and Space Administration
  10. N/A

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 2000 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government