You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
"Rolling Deflectometer"
SBC: Applied Research Associates, Inc. Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
"Sensor Systems for Hazardous Conditions in High Speed Rail"
SBC: ENSCO Inc Topic: N/AN/A
SBIR Phase II 1996 Department of Transportation -
Ionic Self-Assembled Organic/ Inorganic Nonparticle Coatings and Composites
SBC: LUNA INNOVATIONS INCORPORATED Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
Water Quality Monitoring Device
SBC: Gky And Associates, Inc. Topic: N/AThe research is to develop a sheet flow sampler to collect highway washoff and to operate in a highway roadside environment. The proposed sampler is expendable, simple, and cost effective. It will collect a predetermined depth of runoff (most commonly the first 1/2 inch of "first flush"), store it, and be removed and replaced by maintenance workers following rain events. The sampler will be its ...
SBIR Phase II 1997 Department of Transportation -
Water Quality Monitoring Device
SBC: Gky And Associates, Inc. Topic: N/AN/A
SBIR Phase I 1996 Department of Transportation -
NATIONAL HIGHWAY TRAFFIC SAFETY ADMINISTRATION-- EMERGENCY MEDICAL SERVICES
SBC: Humrro International Inc. Topic: N/AHUMRRO INTERNATIONAL, INCORPORATED PROPOSES TO DEVELOP AND EVALUATE THREE PROTOTYPE VIDEODISC-BASED MODULES FOR USE IN MAINTAINING THE SKILLS OF EMERGENCY MEDICAL TECHNICIANS (EMTS). TOPICS FOR THE PROTOTYPE MODULES WILL BE SELECTED BASED ON NEEDS IDENTIFIED IN OTHER RESEARCH. EXISTING VIDEODISCS WHICH ILLUSTRATE EMERGENCY SCENES WILL BE REPROGRAMMED IN ACCORDANCE WITH ALGORITHIMS WHICH SPECIFY AP ...
SBIR Phase II 1988 Department of Transportation -
VALIDATION & TESTING OF THE VAM2D COMPUTER CODE
SBC: Hydrogeologic Inc. Topic: N/AN/A
SBIR Phase I 1988 Nuclear Regulatory Commission -
THE RESEARCH INVESTIGATOR'S TECHNOLOGY SYSTEM "RITA"
SBC: Intellicorp Topic: N/ACOORDINATING INFORMATION EXCHANGE BETWEEN A LARGE NUMBER OF INTERRELATED RESEARCH AND DEVELOPMENT (R&D) PROJECTS HAS TYPICALLY BEEN CONDUCTED USING HIERARCHICAL DATA BASE MANAGEMENT SOFTWARE FOR CATALOGING AND RETRIEVING PROJECT RECORDS. AN INTELLIGENT R&D INVESTIGATOR'S ASSISTANT, ONE THAT USED OBJECT-ORIENTED PROGRAMMING TECHNIQUES TO CLASSIFYPROJECTS AND THAT COULD EMPLOY SUBJECTIVE KNOWLEDGE A ...
SBIR Phase I 1990 Department of Transportation -
Unobtrusive Eyelid Closure & Visual Point of Regard Measurement Device
SBC: EYEGAZE INC Topic: N/AN/A
SBIR Phase I 1997 Department of Transportation -
ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT
SBC: MISSION RESEARCH CORP. Topic: N/AMRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...
SBIR Phase I 1990 Nuclear Regulatory Commission