You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

  1. Extending the Dynamic Flowgraph Methodology (DFM) to Model Human Performance and Team Effects

    SBC: ASCA, INC.            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. SCOPING ANALYSIS OF LWR SHUTDOWN ACCIDENTS INITIATED BY EARTHQUAKES AND INTERNAL FIRES

    SBC: Future Resources Associate Inc            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
  3. ELECTROMAGNETIC ENVIRONMENTAL EFFECTS WITHIN A NUCLEAR POWER PLANT

    SBC: MISSION RESEARCH CORP.            Topic: N/A

    MRC PROPOSES TO DEVELOP A SAFETY PERFORMANCE INDICATOR (PI) OF THE ELECTROMAGNETIC (EM) PROTECTION STATUS OF A NUCLEAR POWER PLANT (NPP). WE BELIEVE THAT SUCH A PI IS NEEDED BECAUSE: (1) EM ENVIRONMENTAL POLLUTION IS ON THE INCREASE,(2) ADDITIONAL EM THREATS MUST BE EVALUATED, AND (3) DISRUPTION OF NPP OPERATIONS BY EM EFFECTS CAN AND MUST BE AVOIDED. PREVIOUS STUDIES HAVE ADDRESSED THE ISSUE OF E ...

    SBIR Phase I 1990 Nuclear Regulatory Commission
  4. EVAL OF RELIABILITY & USEFULNESS OF EXTERNAL-INITIATOR PRA METHODOLOGIES

    SBC: Future Resources Associate Inc            Topic: N/A

    THE DISCIPLINE OF EXTERNAL-INITIATOR PRA ANALYSIS IS RELA- TIVELY LESS MATURE AND LESS RELIABLE THAN THE CORRESPONDING INTERNAL-INITIATORS PRA ANALYSIS. THESE RELATIVE WEAKNESSESHAVE MADE MANY DECISION-MAKERS, IN BOTH INDUSTRY AND THE NRCRELUCTANT TO USE EXTERNAL-INITIATOR PRA RESULTS. THE EXTER-NAL-INITIATOR ANALYSES HAVE BEEN CONSIDERED TOO UNCERTAIN, OR TOO CONSERVATIVE, OR SUPPORTED BY TOO LIT ...

    SBIR Phase I 1988 Nuclear Regulatory Commission
  5. VALIDATION & TESTING OF THE VAM2D COMPUTER CODE

    SBC: Hydrogeologic Inc.            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  6. IMPROVED MODEL FOR PREDICTING J-R CURVES FROM CHARPY DATA

    SBC: Modeling & Computing Services            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  7. MICRO COMPUTER BASED PARALLEL PROCESSING SYSTEM FOR CODE COMPUTATIONS

    SBC: Risk Management Systems            Topic: N/A

    N/A

    SBIR Phase I 1988 Nuclear Regulatory Commission
  8. SEISMIC PRA

    SBC: Future Resources Associate Inc            Topic: N/A

    TECHNIQUES HAVE RECENTLY BEEN DEVELOPED FOR PROBABILISTIC ANALYSIS OF THE RISK FROM EARTHQUAKE-INITIATED ACCIDENTS AT NUCLEAR POWER REACTORS. THESE TECHNIQUES ARE NOW BEGINNING TO BE APPLIED AS PARTS OF LARGER PRA STUDIES. HOWEVER, THE RESULTS OF APPLYING THESE SEISMIC PRA TECHNIQUES ARE STILL HIGHLY UNCERTAIN, AND THE INSIGHTS GAINED SO FAR FOR SPECIFIC REACTORS ARE DIFFICULT TO GENERALIZE. THIS ...

    SBIR Phase II 1984 Nuclear Regulatory Commission
  9. PRESSURIZED WATER REACTOR TRANSIENT ANALYSIS MODEL

    SBC: Levy S Inc            Topic: N/A

    THIS PROPOSAL DESCRIBES A PROGRAM FOR THE DEVELOPMENT OF A PRESSURIZED WATER REACTOR (PWR) TRANSIENT ANALYSIS MODEL FOR USE ON A MICROCOMPUTER. THE INTENDED APPLICATION OF THIS PWR MODEL IS FOR ANALYSIS OF PWR SYSTEM RESPONSE, INCLUDING FORCED AND NATURAL CIRCULATION OPERATION. THE PRIMARY USER OF SUCH A MODEL WOULD BE A UTILITY OR NUCLEAR REGULATORY COMMISSION (NRC) ENGINEER OR PLANT OPERATOR PER ...

    SBIR Phase II 1984 Nuclear Regulatory Commission
  10. PROBABILITY OF FLOODS WITH VERY LONG RETURN PERIODS

    SBC: Linsley Kraeger Associates Ltd            Topic: N/A

    N/A

    SBIR Phase I 1984 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government